RIVERS STATE UNIVERSAL BASIC EDUCATION BOARD (RSUBEB)
INVITATION TO TENDER
The Rivers State Universal Basic Education Board (RSUBEB) has received funds for 2018 from FGN/UBE intervention Fund toward the cost of Universal Basic Education (UBE) Intervention Projects in the State, and intends to apply part of the Funds to cover eligible payment under the following contracts viz Construction, rehabilitation and renovation of classroom blocks, construction of block wall fencings, fabrication and supply of pupils desks and teachers furniture, water supply and sanitation, agricultural development and sport development all for ECCDE, Primary and JS schools in the state, for which this invitation to Tender is issued.
The Rivers State Universal Basic Education Board, Port Harcourt now invites Sealed Tenders from Reputable Contractors/Suppliers for the above mentioned projects as in the schedule below.
CIVIL WORK: PHYSICAL INFRASTRUCTURE-NEW CONSTRUCTION
| LOT NO. | CONTRACT ID. NO. | SCHOOL LOCATION | LGA | DURATION | ||||||||
| PACKAGE 1: CONSTRUCTION OF BLOCK WALL FENCING WITH EXTERNAL INTERLOCKING TILES AND GATE HOUSE-ECCDE AND PRIMARY | ||||||||||||
| 1 | RSUBEB/2018/ECCDE/FC/1/1 | Block wall fencing and Rehabilitation of 3-classroom uni CEF/SUBEB Assisted Nur. P.S (ECCDE) Buguma with Borehole water supply to toilet facility. | ASALGA | 16 WEEKS | ||||||||
| 2 | RSUBEB/2018/PRIM/FC/1/2 | C.H.S Egbomung-Andoni | ANDONI | |||||||||
| PACKAGE 2: CONSTRUCTION OF NEW CLASSROOM BLOCK WITH TOILET FACILITIES-PRIMARY | ||||||||||||
| 1 | RSUBEB/2018/PRIM/NC/2/1 | 1 No. One-Storey 12-Classroom Block in upland LGA at PS 1 Bori | KHANA | 20 Weeks | ||||||||
| 2 | RSUBEB/2018/PRIM/NC/2/2 | 1 No. One-Storey 12-Classroom Block in upland LGA at CPS Rumuekin/Rumuosi | Obio/Akpor | |||||||||
| 3 | RSUBEB/2018/PRIM/NC/2/3 | No. 8 -Classroom Block in upland LGA at SS IV Eneka | Obio/Akpor | 16 Weeks | ||||||||
| 4 | RSUBEB/2018/PRIM/NC/2/4 | 1 No. 8-Classroom Block in riverine LGA at Central School Bonny | Bonny | |||||||||
| 5 | RSUBEB/2018/PRIM/NC/2/5 | 1 No. 6-Classroom Block in upland LGA at SS IV Egbeda | Emohua | |||||||||
| 6 | RSUBEB/2018/PRIM/NC/2/6 | 1 No. 6-Classroom Block in upland LGA at ETS Egwi | Etche LGA | |||||||||
| 7 | RSUBEB/2018/PRIM/NC/2/7 | 1 No. 6-Classroom Block in upland LGA at CPS Borghorveghe | Gokana LGA | |||||||||
| 8 | RSUBEB/2018/PRIM/NC/2/8 | 1 No. 6-Classroom Block in upland LGA at CPS Nyorkwiri-Boue | Khana | |||||||||
| 9 | RSUBEB/2018/PRIM/NC/2/9 | 1 No. 6-Classroom Block in upland LGA at UPE Elioparanwo | Obio/Akpor | |||||||||
| 10 | RSUBEB/2018/PRIM/NC/2/10 | 1 No. 6-Classroom Block in upland LGA at UPE Ogbede | Ah-West | |||||||||
| 11 | RSUBEB/2018/PRIM/NC/2/11 | 1 No. 6-Classroom Block in riverine LGA at CPS Ogbokuma | ||||||||||
| 12 | RSUBEB/2018/PRIM/NC/2/12 | 1 No. 6-Classroom Block in riverine LGA at SS Minama | Asari-Toru | |||||||||
| 13 | RSUBEB/2018/PRIM/NC/2/13 | 1 No. 6-Classroom Block in riverine LGA at CPS Ayama Peter side | Opobo/Nkoro | |||||||||
| PACKAGE 3: CONSTRUCTION OF NEW CLASSROOM BLOCK WITH TOILET FACILITIES-JSS | ||||||||||||
| 1 | RSUBEB/2018/JSS/NC/3/1 | 1 No. One-Storey 12-Classroom Block in upland LGA at Modern Junior Sec. Sch. GRA | Port Harcourt city | 20Weeks | ||||||||
| 2 | RSUBEB/2018/JSS/NC/3/2 | 1 No. One-Storey 12-Classroom Block in upland LGA at CJSS Olanada | Obio/Akpor | |||||||||
| 3 | RSUBEB/2018/JSS/NC/3/3 | 1 No. One-Storey 12-Classroom Block in upland LGA at CSS Rumuorlu | Obio/Akpor | |||||||||
| 4 | RSUBEB/2018/JSS/NC/3/4 | 1 No. One-Storey 12-Classroom Block in upland LGA at CSS Omagwa | Ikwerre | |||||||||
| 5 | RSUBEB/2018/JSS/NC/3/5 | 1 No. 8- Classroom Block in upland LGA at CJSS Iriebe | Obio/Akpor | 16Weeks | ||||||||
| 6 | RSUBEB/2018/JSS/NC/3/6 | 1 No. 6- Classroom Block in upland LGA at CSS Omofondele | Emohua | |||||||||
| 7 | RSUBEB/2018/JSS/NC/3/7 | 1 No. 6- Classroom Block in upland LGA at CSS Ogale | Eleme | |||||||||
| 8 | RSUBEB/2018/JSS/NC/3/8 | 1 No. 6- Classroom Block in upland LGA at GSS Eneka | Obio/Akpor | |||||||||
| 9 | RSUBEB/2018/JSS/NC/3/9 | 1 No. 6- Classroom Block in upland LGA at CSS Omuanwa | Ikwerre | |||||||||
| 10 | RSUBEB/2018/JSS/NC/3/10 | 1 No. 6- Classroom Block in riverine LGA at CJSS Finima | Bonny | |||||||||
| PACKAGE 4: CONSTRUCTION OF BLOCK WALL FENCING WITH EXTERNAL INTERLOCKING TILES AND GATE HOUSE –JSS | ||||||||||||
| 1 | RSUBEB/2018/JSS/FC/4/1 | CJSS Egbeda in upland LGA | Emohua | 16Weeks | ||||||||
| 2 | RSUBEB/2018/JSS/FC/4/2 | CSS Kano-Boun in upland LGA | Khana | |||||||||
| 3 | RSUBEB/2018/JSS/FC/4/3 | MPS Okpaako in upland LGA | Eleme | |||||||||
| 4 | RSUBEB/2018/JSS/FC/4/4 | CSS Bille in riverine LGA | Degema | |||||||||
| CIVIL WORK: PHYSICAL INFRASTRUCTURE-REHABILITATION AND RENOVATIONPACKAGE 5: REHABILITATION AND RENOVATION- PRIMARY | ||||||||||||
| 1 | RSUBEB/2018/PRIM/RH/5/1 | 1 No. 14- Classroom Block including toilet facilities in upland LGA at SS 1 Omudiaga | Emonua | 16Weeks | ||||||||
| 2 | RSUBEB/2018/PRIM/RH/5/2 | 1 No. 14- Classroom Block including toilet facilities in upland LGA at SS 1 Orogbum | Port Harcourt City | |||||||||
| 3 | RSUBEB/2018/PRIM/RH/5/3 | 1 No. 14- Classroom Block including toilet facilities in upland LGA at MPS 1 Botem | TAI | |||||||||
| 4 | RSUBEB/2018/PRIM/RH/5/4 | 1 No. 14- Classroom Block including toilet facilities in upland LGA at Nyamani SS Abonnema | Akuku-Toru | |||||||||
| 5 | RSUBEB/2018/PRIM/RH/5/5 | 1 No. 14- Classroom Block including toilet facilities in riverine LGA at ST. Paul Opobo | Opobo/Nkoro | |||||||||
| 6 | RSUBEB/2018/PRIM/RH/5/6 | 1 No. 8- Classroom Block including toilet facilities in upland LGA at CPS 1 Luusuesogho | Khana | 16Weeks | ||||||||
| 7 | RSUBEB/2018/PRIM/RH/5/7 | 1 No. 8- Classroom Block including toilet facilities in riverine LGA at ST. Andrew state school, George-Ama | Okrika | |||||||||
| 8 | RSUBEB/2018/PRIM/RH/5/8 | 1 No. 6- Classroom Block including 7 room toilet facilities in upland LGA at SS II Aluu | Ikwerre | |||||||||
| 9 | RSUBEB/2018/PRIM/RH/5/9 | 1 No. 6- Classroom Block including 7 room toilet facilities in upland LGA at SS 1 Ofehomuma | Omuma | |||||||||
| 10 | RSUBEB/2018/PRIM/RH/5/10 | 1 No. 6- Classroom Block including 7 room toilet facilities in upland LGA at ST. Stephen PS II Omuku | Onelga | |||||||||
| 11 | RSUBEB/2018/PRIM/RH/5/11 | 1 No. 6- Classroom Block including 7 room toilet facilities in upland LGA at CPS Oyigbo North Oyigbo | Oyigbo | |||||||||
| 12 | RSUBEB/2018/PRIM/RH/5/12 | 1 No. 6- Classroom Block including 7 room toilet facilities in upland LGA at PS 1 Nonwa | TAI | |||||||||
| 1 | RSUBEB/2018/PRIM/RH/Ws/5/1 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities at CPS Okporowo | AH-East | |||||||||
| 2 | RSUBEB/2018/PRIM/RH/Ws/5/2 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities at UPE Odiopiti | AH-West | |||||||||
| 3 | RSUBEB/2018/PRIM/RH/Ws/5/3 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities at SS III Omudioga | Emohua | |||||||||
| 4 | RSUBEB/2018/PRIM/RH/Ws/5/4 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities at CPS Biara | Gokana | |||||||||
| 5 | RSUBEB/2018/PRIM/RH/Ws/5/5 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in upland LGA at CPS Omelema | Abua/Odual | |||||||||
| 6 | RSUBEB/2018/PRIM/RH/Ws/5/6 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in upland LGA at CSS Umuokomobibi Etche | Etche | |||||||||
| 7 | RSUBEB/2018/PRIM/RH/Ws/5/7 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in riverine LGA at St. Joseph Abonnema | Akuku-Toru | |||||||||
| PACKAGE 6: REHABILITATION AND RENOVATION- JSS | ||||||||||||
| 1 | RSUBEB/2018/JSS/RH/6/1 | 1 No. 8- Classroom Block including 7 room toilet facilities in upland LGA at GTC PH | Obio/Akpor | 16Weeks | ||||||||
| 2 | RSUBEB/2018/JSS/RH/6/2 | 1 No. 8- Classroom Block including 7 room toilet facilities in upland LGA at GCSS Borokiri PH | Port Harcourt City | |||||||||
| 3 | RSUBEB/2018/JSS/RH/6/3 | 1 No. 8- Classroom Block including 7 room toilet facilities in upland LGA at CSS Ogobolobo | Okrika | |||||||||
| 4 | RSUBEB/2018/JSS/RH/6/4 | 1 No. 9- Classroom Block including 7 room toilet facilities in upland LGA at GSS Ngo | Andoni | |||||||||
| 5 | RSUBEB/2018/JSS/RH/6/5 | 1 No. 7- Classroom Block including 7 room toilet facilities in upland LGA at GTC Ogu | AH-East | |||||||||
| 6 | RSUBEB/2018/JSS/RH/6/6 | 1 No. Workshop/Office GTC Ogu | Ogu/Bolo LGA | |||||||||
| 1 | RSUBEB/2018/JSS/RH/Ws/6/1 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in upland LGA at CSS Rumuokurusi | Obio/Akpor | |||||||||
| 2 | RSUBEB/2018/JSS/RH/Ws/6/2 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in upland LGA at CSS Umuogba | Omuma | |||||||||
| 3 | RSUBEB/2018/JSS/RH/Ws/6/3 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in upland LGA at ACMGS Elelenwa | Obio/Akpor | |||||||||
| 4 | RSUBEB/2018/JSS/RH/Ws/6/4 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in riverine LGA at CSS Abonnema | Akuku-Toru | |||||||||
| 5 | RSUBEB/2018/JSS/RH/Ws/6/5 | 1 No. 6- Classroom Block including borehole water supply and toilet facilities in riverine LGA at GSS UBE Usokun | Degema | |||||||||
PHYSICAL INFRASTRUCTURE: FABRICATION AND SUPPLY OF ECCDE, PRIMARY AND JSS FURNITURE (EXCEPT OTHERWISE DESCRIBED ALL WROUGHT FURNITURE WORK SHALL BE OF MAHOGANY/CEDAR/PINE WOOD)
PACKAGE 7: ECCDE, PRIMARY AND OTHER FURNITURE
| LOT NO | CONTRACT ID NO. | DESCRIPTION OF ITEM | QTY | SCHOOL LOCATION AND LGA | DURATION |
| 1 | RSUBEB/2018/PRIM/FS/7/1 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 1.8m 4 layersTable top refrigerator | 690464646666666 | SS I Omudioga EMOLGA -180/12PS IBori KHANA-150/10CHS EGbomung ANDONI -90/6MPS OKPAAKO ELEME – 90/6SS II Egbe da EMOHUA – 90/6ETS Egwi ETCHE LGA – 90/6 | 16 Weeks |
| 2 | RSUBEB/2018/PRIM/FS/7/2 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660444444666666 | SS I Orogbum PHALGA -180/12Central School Bonny OLGA-120/8CPS Nyorkwiri-Boue Khana -90/6CPS Elioparanwo OBALGA – 90/6CPS Ogbokuma Abolga – 90/6SS Minama Asalga – 90/6 | 16Weeks |
| 3 | RSUBEB/2018/PRIM/FS/7/3 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660444444666666 | MPS I Botem TAI – 180/12SS IV Eneka Obalga – 120/8UPE Ogbede AH-West- 90/6CPS Borghor Gokana Lga – 90/6SS II Aluu Kelga – 90/6 | 16Weeks |
| 4 | RSUBEB/2018/PRIM/FS/7/4 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660444444666666 | Nyemoni SS Abonnema Akulga- 180/12CPS I Luusuesogho Khana – 120/8SS I Ofeh Omuma – 90/6ST. Stephen PS II Omuku Onelga – 90/6CPS Oyigbo North Oyigbo – 90/6PS I Nonwa Tai – 90/6 | 16Weeks |
| 5 | RSUBEB/2018/PRIM/FS/7/5 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660444444666666 | ST. Paul Opobo – 180/12ST. Andraw Okrika – 120/8George-Ama Okrika -120/8CPS Okporowo AH-East – 90/6UPE Odiopiti AH-West – 90/6SS III Omudioga Emolga – 90/6CPS Biara Gokana- 90/6 | 16Weeks |
| 6 | RSUBEB/2018/PRIM/FS/7/6 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 810545454999999 | CPS Omalema Abolga- 90/6 CPS IIUmuode/Umudimakpoku Etche- 90/6St. Joseph Abonnema- 90/6CCSS Rumuokurual Obalga – 90/6CPS Oyibo North Oyigbo- 90/6(From Selected Sch.)CPS Oyibo Oyigbo- 90/6UPE Joinkrama AH-West- 90/6CPS II Deeyor Gokana -90/6CPS III Deeyor Gokana- 90/6 | 16Weeks |
| 1school has the following ECCDE furniture 0.45m wide x 2.4m long x 1m high formica faced shelves in 300 x 300 cubiclesSet of 1no. ECCDE plastic table and 3 plastic chairsWriting desk with 2 drawersWooden arm chairHigh padded seat1.2m x 2,4m magnetic board and duster1.2m x 1.8m notice aluminium framed | 33033633 | UNICEF/SUBEB Assisted Nur. P.S Buguma Asalga | 16Weeks | ||
| 7 | RSUBEB/2018/PRIM/FS/7/7 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 630424242777777 | CPS Teenama Khana- 90/6CPS Semelueku Khana- 90/6CPS Elelenwo Obolga- 90/6CPS Rumukwurusi Obolga- 90/6SPS Agwa-Wirie Kelga- 90/6SPS St. PatrickAllminiislokpo Kelga- 90/6SPS II Ubima Kelga- 90/6 | 16Weeks |
| 8 | RSUBEB/2018/PRIM/FS/7/8 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660424242777777 | SS Ogoloma Abolga- 90/6ACSS Adada Abolga- 90/6CPS Okokiri Andoni- 90/6CPS Polokiri Andoni- 90/6SS Kula Akulga- 90/6Okio Memorial SS IdamaAkulga -120/6SS Elem Sangama Akulga- 90/6 | 16Weeks |
| 9 | RSUBEB/2018/PRIM/FS/7/9 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 630424242777777 | St. Paul Opobo/Nkor – 90/6SS Agba Ndele Emolga- 90/6St. Pauls Sch. Ahoada AH-East 90/6CPS I Ahoada AH-East- 90/6GPS II Ahoada AH-East- 90/6MPS Dumo-Ama Welga – 90/6St Andrews SPS George-ama – 90/6 | 16Weeks |
| 10 | RSUBEB/2018/PRIM/FS/7/10 | 2 – Seater pupils deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 630424242777777 | CPS Baraobara TAI -90/6CPS Gbam Tai- 90/6CPS I Nonwa Tai- 90/6CPS Umudike Umuogba -90/6SS II Obibiumuogba Omuma- 90/6Omuma-90/6CPS Azoga Oyigbo- 90/6 | 16Weeks |
| PACKAGE 8: JSS FURNITURE | |||||
| 1 | RSUBEB/2018/JSS/FS/8/1 | 2 – Seater studets deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660444444666666 | MJSS GRA Phalga- 150/10CSS Rumuorlu Obalga- 150/10CSS Omofo Ndele Emohua- 90/6CSS Ogale Eleme- 90/6GSS Eneka Obalga- 90/6CSS Omuanwa Ikwerre- 90/6 | 16Weeks |
| 2 | RSUBEB/2018/JSS/FS/7/8 | 2 – Seater students deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660444444555555 | CSS Rumuekini/Rumuasi Obalga- 150/10CSS Omagwa Kelga- 150/10CJSS Iriabe Obalga- 120/8GCSS Borokiri PH Phalga- 120/81 CSS Ogobolobowelga- 120/8 | 16Weeks |
| 3 | RSUBEB/2018/JSS/FS/8/3 | 2 – Seater students deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 660444444666666 | CJSS Olanada Obalga- 150/10GTC PH Obio/Akpor- 135/9GTC Ahoada AH- East – 105/7ACMGS Elelenwa Obio/Akpor- 90/62CSS Umuogba, Omuma- 90/6CSS Abonnema Akulga- 90/6 | 16Weeks |
| 4 | RSUBEB/2018/JSS/FS/8/4 | 2 – Seater students deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 543363636888888 | GSS Ngo Andoni- 120/8CJSS Finima Olga- 90/6CJSS Egbeda Emohua 30/2CSS Bille Delga 60/4CSS Kono Boue Khana 30/2GJSS Onne Elelga- 93/6- From selected | 16Weeks |
| 5 | RSUBEB/2018/JSS/FS/8/5 | 2 – Seater students deskTeachers’ table with 2 drawersTeachers’ wooden arm chairVisitors’ wooden armless chairExecutive desk I shapedExecutive metal arm chairVisitors high wooden chair4 drawer filling cabinetsBook shelves 1.8m x 2.8m 4 layersTable top refrigerator | 723484848888888 | CSS Rumuapara Obolga- 90/6CSS Rumuopirikom Obalga- 90/6CSS Emilaghan Abolga-90/6CSS Ekede Andoni- 90/6GSS Abissa Akulga- 90/6CSS Soku Akulga- 90/6CSS Elele-Alimini Emolga- 90/6 | 16Weeks |
| PACKAGE 9: AGRICULTURAL DEVELOPMENT- SCHOOL FARM | |||||
| 1 | RSUBEB/2018/AD/SP/9/1 | Construction of 3m x 3m x 1.2m Fish pond- 4 no. each | 5 | CSS Ikodi Engenni AWELGACSS UngeadaAndoniMJSS GRA PH PHA LGAPSI NONWA TAICSS EleleAliminiEMOLGA | 16 Weeks |
| 3 Provision of operating items as weighing scale, rubber basins, Agric lime, scoop net etc | 5 sets | ||||
| 4 Recurrent itens as Flash Fingerlings, starter feeds and grow out feed AND | 5 sets | ||||
| Clearing of site | 5 | ||||
| 2 | RSUBEB/2018/AD/SF/9/2 | Construction of 4m x 4m x 1.2m well insulated Poultry house- 4no. each | 10 | CSS Abonneme AKULGACSS OmugwaikwerreCSS Oyigbo, OYILGACPS 1 Ahoada, AELGAGGSS Ogomola, WALGAGCSS Borikiri, PHALGAGSS UBE Usokun, DELGAMGSS Rumueme, Obio-AkporGSS Eneka, Obio-Akpor | 16 Weeks16 Weeks |
| 3 provision of operating items as weighing scale, rubber buckets, feeders, drinkers, broom, shovels, crates etc | 10 sets | ||||
| 4 Recurrent items as Chics, feeds, disinfectors, drugs and vaccines | 10 | ||||
| 3 | RSUBEB/2018/AD/SF/9/3 | Clear Shrubs, tilt top soil ready for planting mixed crops | 5 sites | CSS Omudiaga, EMOLGACSS Rumuekini ObolgaCSS Omuanwa, KELGACSS KonoBoue, KHANCSS OmoforNdele EMOLGA | |
| 3 Provision of operating items As Hoes, cutlass, shovel, rakes, Water hose etc | 5 sets | ||||
| 4 Recurrent items as various crops and fertilizers AND | 5 set | ||||
| 180 plantain suckers | 5 | ||||
| Burning of Bush | 5 | ||||
| PACKAGE 10: SPORTS DEVELOPMENT | |||||
| 1 | RSUBEB/2018/PRIM/JSS/SD/10/1 | 100% of the following Items to be procured within 4 months | 13No. selected Primary and JSS at1. CPS Rumuekin OBA LGA2. CSS ObiteEtche3. CSS Ogbogu ONE LGA4. CSS Obuama DELGA5. CSS Omuanwa KELGA6. GTS Ele Ogu OGU/BOLO7. CPS Queens Town OPOBO/NK8. CPS RumuopaeraliOBA LGA9. State School I Eneka OBA LGA10. CPS Elogbolo ABOLGA11. SPS Bori Khana12. SS Omudioga13. 13 SS 1 Ndele EMO LGA | 16 Weeks | |
| 1. Table Tennis Board | 13 | ||||
| 2. Volley stand post and net | 13 | ||||
| 3. Volley ball post and net with accessories | 13 | ||||
| 4. Football post and net with accessories | 13 | ||||
| 5. Basketball stand and net | 13 | ||||
| 6. Badminton stand and net | 13 | ||||
| 7. Judo mat and 10no. Judo | 13 | ||||
| 8. Taekwondo mat and 10no. Taekwondo Coats | 13 | ||||
| 9. High Jump stand and cross bar | 13 | ||||
| 10. High jump foam and mattress | 13 | ||||
| INSIGNIA ON ALL SPORT ITEMS | ITEMS |
Interested contractors should register with the sum of Ten Thousand (N10, 000.00) Naira only with the Department of Planning Research and payment should be made into the designated account:
ACCOUNT NAME: RSUBEB-DIRECT
IMPLEMENTATION COMMITTEE ACCOUNT NO: 1014096489
BANK NAME: ZENITH BANK PLC
TENDER PRE-QUALIFICATION REQUIREMENT
(1) Certificate of Incorporation with Form C02 and C07 for Limited Liability Company
(2) Company Profile
(3) Evidence of registration as a contractor with RSUBEB
(4) Tax Clearance for last three years
(5) Audited Accounts (for Limited Liability) for last three years
( 6) Letter of Reference from Bankers
(7) VAT Certificate
(8) TIN and BIN for both Limited Liability Company and Enterprise
(9) Evidence of Verifiable experience on similar contract or supplies executed
(10) Work Programme for the proposed tender.
(11) Evidence Technical Personnel to perform the obligation of the
contract, including their CVs and copies of professional memberships
e,g. COREN as regards storey building.
(12) A sworn affidavit of
disclosure of interest that none of its Director is serving member of
UBEC/SUBEB and that none of the Directors of the firm has been convicted
for any criminal offence relating to fraud, financial capacity from a
reputable bank.
(13) Evidence of compliance certificate from ITF, NSIFT, PENCOM
Evidence of Registration of the company on the data base of Bureau of Public Procurement (BPP).
GENERAL INFORMATION
Interested Contractors who must have registered Business Names with the
Co-operate Affairs Commission and registered with RSUBEB PH may
purchase Tender Documents at the office of the Director of Planning,
Research and Statistics. RSUBEB 16A Elechi Beach, Mile One Diobu, Port
Harcourt, for a non- refundable fee of Twenty Thousand (N20,000.00) for
all supplies of furniture & Equipment, Construction, Rehabilitation,
Renovation, completion and fencing into a dedicated RSUBEB Bank
account, for each set of Tender Document. Receipts should be obtained
from the Account Department of the Board. Interested Bidders may obtain
further information at the same address.
Tenders shall be returned in two sealed envelopes of Pre-qualification Information and Commercial contained in one package to the address above on or before Friday 2 August, 2019, 12 noon. LATE TENDERS WILL BE REJECTED. Tenders shall be opened in the presence of Bidders who wish to attend on Friday 2 August, 2019, 12 noon at the Conference Room of the Board 16A Elechi Beach, Port Harcourt. Only Commercial Tenders of Pre- qualified Bidders shall be considered for analysis.
All Tender packages should have CONTRACT PACKAGE NO, LOT NO and CONTRACT ID NO clearly set out in BLOCK LETTERS AT THE TOP RIGHT HAND SIDE OF THE TENDER PACKAGE.
Please note that Rivers State Universal Basic Education is NOT BOUND to accept the Lowest Tender.
VEN. DR. FYNEFACE .N. AKAH JP
EXECUTIVE CHAIRMAN
(RSUBEB)
