NASARAWA STATE GOVERNMENT STATE UNIVERSAL BASIC EDUCATION BOARD (SUBEB)
INVITATION FOR PREQUALIFICATION OF CONTRACTS FOR 2019 FGN-SUBEB INTERVENTION PR0JECTS  
SHENDAM ROAD, P.M.B. 050 LAFIA, NASARAWA STATE

The Nasarawa State Universal Basic Education Board, (SUBEB) Lafia hereby
invites interested and experienced contractors to express their interest for
prequalification for the following projects:

1.0 2019 FGN-UBEC/SUBEB INTERVENTION PROJECTS
i. Construction of blocks of 2 classrooms with 2 offices
ii. Construction of blocks of 3 classrooms with 2 offices
iii. Construction of blocks of 4 classrooms
iv. Construction of Perimeter Fence, Gate and Gatehouse
v. Construction of Drainages and Kerbs
vi. Geophysical Surveys for 25 Boreholes
vil. Construction of Hand pump Boreholes
vii. Construction of 4 Compartment Toilets (water system)
ix. Supply of furniture (Metal and Wood Dual Desks), 50mm x 50mm Black metal iron pipe with seasoned MDF plywood (19mm)
x. Rehabilitation/Renovation of Blocks of Classrooms with offices

2.0 PREQUALIFICATION REQUIREMENTS
All prospective interested companies shall be required to submit the following prequalification documents:
a) Contractors Resume/Profile
b) Registration with the Corporate Affairs Commission (CAC)
c) Up-to-date Tax Clearance
 d) Registration as a contractor with the Nasarawa SUBEB Financial Capabilitye) Verifiable evidence of similar jobs handled in the last 3 years
g) Interim Registration Report from BPP
h) PenCom Certificate
i) Industrial Training Fund (ITF)

3.0 SUBMISSION OF PREQUALIFICATION DOCUMENTS
All prequalification documents should be enclosed in a sealed envelope Marked “YEAR 2019 FGN-UBEC/SUBEB INTERVENTION PROJECT” and addressed to:
The Procurement officer,
Due Process Committee Secretary,
State Universal Basic Education Board, Lafia
Shendam Road, Lafia
P.M.B. 050 Lafia, Nasarawa State

All applications to be submitted, not later than 2 weeks from the date of this publication.

NOTE:
a. Please note that only successful pre-qualified contractors would be considered to Bid for the relevant proposed projects
b. The Board is not bound to pre-qualify any Bidder and reserves the right to annul the procurement process at any time without incurring any liability in accordance with the relevant sections of the Public Procurement Act (2007) as amended

Signed:
Musa Tanko Mohammad
Secretary
Due Process Committee