ABUJA ELECTRICITY DISTRIBUTION PLC (AED PLC) INVITATION TO BID
SUBJECT: REQUEST FOR SEALED BID (RFSB) FOR PHASE 1 PROJECTS
PERFORMANCE IMPROVEMENT PLAN (PIP)
ISSUANCE DATE: 25TH MAY, 2021
CLOSING DATE: 15TH JUNE, 2021
1. Introduction
Abuja Electricity Distribution Plc (AED Plc) established in November 2013, is a company registered under the laws of the Federal Republic of Nigeria AED Plc is Required to maintain power quality in line with prevailing Nigeria regulations as set by the Nigerian Electricity Regulatory Commission (NERC) in its Customer Service Standards of Performance together with internationally accepted standards (EC 60050)
2. The Service
AED Plc is requesting for bids (Technical and Financial) from qualified firms for the below requested projects
LOT DESCRIPTION OF SERVICE LOCATION LOT REFERENCE BID SECURITY BID VALIDITY LOT 1A Proposed Resuscitation of Underground failed links in FCT Phase 1, 85 to c2. FCT AEDC 3 2% of bid value 90 Days LOT 1B Proposed Resuscitation of Underground failed links in FCT Phase 1, C4 to B52. FCT AEDC 2 2% of bid value 90 Days LOT 2A Rehabilitation of Fdr 4 from R4 (3 ARMS ZONE) 4X15MVA injection Substation FCT AEDC 23 2% of bid value 90 Days LOT 2B Proposed Resuscitation of Underground failed links in FCT Phase 1, Ca to C3 FCT AEDC 4 2% of bid value 90 Days LOT 3A Upgrade from 1no 5MVA 33/11kV S/5 to 2X7.5MVA and radiation of
additional 11kv feeders at Madalla/Zuba from Suleja TSNiger State AEDC 26 2% of bid value 90 Days LOT 3B Rehabilitation of 11kV Army Barracks Fdr Bida from Bida TS Niger State AEDC 36 2% of bid value 90 Days LOT 4 Supply of Transformers FCT AEDC 41 2% of bid value 90 Days LOT 5 MD HV Metering Panel FCT AEDC 54 2% of bid value 90 Days
3. Bidding Procedure
Bid security The bid security will be forfeited, if the Bidder
(a) withdraws his/her bid after it is opened during the period of validity specified in the bid, or
(b) having been awarded the contract fais (1) to sign the contract on the term and conditions provided in his bid, or (2) to furnish the Performance Security, if required to do so
The performance security shall be 10% of the Contract Price and in the farm of a Bark Guarantee. All bank guarantees should be addressed to NESI-SSL
- Bidders cannot bid for more than two lots. The lots have been grouped as Lat 1 (1A & 18), Lot 2 (2A & 2B) and Lot 3 (3A & 38) and MUST bid for all tens in each chosen Lot. Six (6) contracts will be awarded under this procurement (for construction works) and a qualified bidder will only be awarded two contracts for constructions works ONLY
- Lot 4 is open to only transformer manufacturers
- Lot 5 is open to only NERC approved meter suppliers
4. Access to the Bidding Document
- Interested bidders are requested to visit AED Plc website (www.abujaelectricity.com), click on home then procurement and download
- Request for sealed bid for the various designated procurement lots
- All information regarding preparation, clarifications and submission are contained in the bidding document
- Signed: Management