DEADLINE: 2ND AUGUST, 2021
JOS ELECTRICITY DISTRIBUTION (JED) PLC
EXPRESSION OF FOR THE SUPPLY AND INSTALLATION OF EQUIPMENT AS WELL AS CONSTRUCTION

(1) INTRODUCTION
Jos Electricity Distribution PLC (JED PLC) has received a CREDIT facility from the Central Bank of Nigeria (CBN) for Accelerated Transmission – Distribution Interface Projects to invest in the Transmission Company of Nigeria (TCN)’s rehabilitation and expansion projects.

(2) SCOPE OF WORKS
The scope of work shall include Supply and Installation of Equipment as well as Construction as specified below:

S/NDescriptionLot Name
1Supply 2No. 150/165MVA, 330/132/33kV Power TransformersJEDC/SS/Lot 1
2Supply 2No. 100/125MVA, 132/33kV Power TransformersJEDC/SS/Lot 2
3Supply 2No. 60/66MVA, 132/33kV Power TransformersJEDC/SS/Lot 3
4Supply 1 No. 60/66MVA, 132/33W Mobile Power TransformerJEDC/SS/Lot 4
5ASA 30/4CMVA, 132kV/33kV Transmission Station (Otukpo TS):Provision of 33kV bay and associated equipment at .Asa 7.5MVA. 132/33kV Otukpo TS.JEDC/SS/Lot 5
6Upgrade of 1X40MVA, 132/33W Mobitra to 1x60MVA, 132/33kW Power transformer a: Apir TS, Markudi.JEDC/SS/Lot 6
7Gombe 330/132/33kV TS:Supply and Installation of 1 x 100MVA, 132/33kV Power Transformer at 132/33kV Gombe TS.JEDC/SS/Lot 7
8Pankshin 2x60MVA 132kV/33kV Transmission Station: Construction and erection of 10nos suspension towers of 132kV Pankshin- Makeri D/C Transmission LineJEDC/SS/Lot 8

(3)  ELIGIBILITY REQUIREMENTS (NIGERIAN COMPANIES ONLY)
Suitable Companies are invited to participate in the prequalification exercise by submitting the following pre-requisite requirements:

(a) Certificate of Incorporation with the Corporate Affairs Commission (CAC) in Nigeria with forms C02 and C07),

(b) Current Tax Clearance Certificate for the past three Years valid till December 2020

(c) Three years Company Audited Financial Statements for the year 2018 – 2020 duly stamped by a registered Audit firm.

(d) PENCOM compliance Certificate valid till 31st December 2021.

(e) Industrial Training Fund (ITF) compliance Certificate Valid till 31st December 2021

(f) Nigeria Social Insurance Trust Fund (NSITF) Compliance Certificate valid till 31st December 2021.

(g) NEMSA compliance Certificate valid till 31st December 2021.

(h) For Joint Venture Partnerships, the Joint Venture Agreements must be signed by all the parties, a copy of which must be attached. In addition, all partners meet the above requirements.

(4) QUALIFICATION REQUIREMENTS
Applicants are required to provide the following qualification requirements.

(a) Minimum average annual turnover over of Two hundred and fifty Million Naira (N250,000,000.00) the past three (3) years as shown below;

(b) Manufacturer’s Authorization,

(c) Evidence of European Standards Certificates and/or KEMA,

(d) The Applicant shall demonstrate that it has access to, or has available liquid assets, unencumbered real assets, lines of credit, and other financial means (independent of any contractual advance payment) sufficient to meet the construction cash flow requirements.

(e) Evidence of Experience of at least three (3) projects of similar nature and complexity completely executed in the last five years, including final Taking-Over Certificates from clients.

(d).Company Profile including:

  • Populated organizational structure and key professional staff with relevant experience & qualifications on high voltage power lines and substations.

(5) SUBMISSION OF DOCUMENTS
One soft and two hard copies of the documents are to be submitted. The names and mailing addresses of the applicant Companies must be clearly marked on the envelope(s) bearing the submissions. All the information requested for pre-qualification must be provided in English Language by all applicants.

Failure to provide information/supporting documents that is essential for the evaluation of applicant’s qualifications, or to provide timely clarification or substantiation of the information supplied, may result in disqualification of the applicant.

Completed pre-qualification application(s) should be submitted in a sealed envelope(s) clearly marked “EXPRESSION OF INTEREST FOR PRE-QUALIFICATION FOR THE SUPPLY & INSTALLATION PROJECTS – JEDPLC/SS/LOTS” OR “EXPRESSION OF INTEREST FOR PRE-QUALIFICATION FOR THE CONSTRUCTION PROJECT – JEDPLC/OL/LOT”, that is, separately envelopes for each of the project lot.

Delivered by hand or registered mail to the address stated below to reach her NOT later than 3.00pm Monday 2 August, 2021.

Expression of Interest must be delivered by hand to Procurement Department, Jos Electricity Distribution Plc., No. 9 Ahmadu Bello Way, Jos, Plateau State.

(6) OPENING OF APPLICATIONS
Opening of applications will be by 11.00am Thursday 5 August, 2021 at the address stated above.

(7) PLEASE NOTE
(a) Applications submission after the deadline shall be returned unopened to the respective Applicants.

(b) JED PLC reserves the right to verify any claim by Applicants and should, therefore, include in their submission’s Necessary authority and guarantee for such verification.

(c) This advertisement shall not be construed as a commitment on the part of JED PLC to prequalify any Applicant.

(d) Further information/enquiries shall be available on JED Pic website: www.jedplc.com.  Accordingly any clarification or additional information with respect to this publication, emails shall be sent to:

murtala.raji@jedplc.com
john.emeruwa@jedplc.com

SIGNED:
MANAGEMENT