DEADLINE: 22ND AUGUST, 2021
TRANSCULTURAL PSYCHOSOCIAL ORGANISATION (TPO) NIGERIA
REQUEST FOR TENDER/QUOTES FOR THE RENOVATION OF 52 TEMPORARY LEARNING SPACES (TLSS) WITH WASH FACILITIES FITTED WITH RAMS AND RAILS IN GWOZA (PULKA) AND MONGUNO LGA, BORNO STATE

Name of project: Protective Inclusive Quality Education for Conflict affected Children in Bonoo, Adamawa and Yobe State
Tender Open Date: 9th August,2021
Tender Closing Date: 22nd August,2021 at 12 Midnight
The quotation request requires the Contractor to provide at least the following info:
1. Unit and total price of the each item described
2 Completion time and date
3 Validity of quotation
4. The name and address of the contractor
5. Reference number
6. Contact person and phone if any
Method of Application
Please be advised that all Interested parties are required to be registered in Nigeria before an award can be made.
Quotations submitted by hand should be in a sealed envelope and sent to:
Address: No 33, Baba Musami Street, Old GRA, Maiduguri, Borno State.

Quotation submitted by email should be sent to the following email address: Maiduguri@tpordc.org

Quotation should reach the above address no later than one (14) days from the date of this publication.

Late quotation will not be accepted.

Each page of the offer must be dated, signed and stamped with company stamp.
BILL OF QUANTITY FOR THE RENOVATION OF ONE BLOCK OF TEMPORARY LEARNING SPACE IN PULKA AND MONGUNO LGA
S/N DESCRIPTION QUANTITY UNIT RATE (N) AMOUNT (N)
ROOFING
1 Facial Board 10 Pcs
2 Ceiling Board (Brazil) 30 Pcs
3 2×2 wood for noggin 100
4 2×3 wood for Rafter 40
5 Zinc 2
6 Nail 3 30 Kg
7 Nail 4 30 Kg
8 Nail 5 15 Kg
9 Nail 1 15 Kg
10 Roofing Nail 1 Packet
11 Batting 60 Pcs
12 white paint for ceiling 1 bucket
13 Nedal Trap (Langa Langa) 20 Pcs
14 Engine Oil 25 Liters
15 Silly gram (Anti Termite) 20 Liters
16 Black oil paint for facial board 4 Liters
17 Carpenter labour sum
FLOORING
1 Cement 7 Bags
2 Sharp sand 7 Tones
3 Water Sum
4 Labour for mason sum
RAMP
1 Gravel Tones 1
2 Sand Tones 2
WALL
1 Plaster Sand 9 Tones
2 Cement for plaster and laying of blocks 13 Bags
3 Blocks 80 Pcs
4 Labour for laying of blocks and plastering sum
5 Painting Light Blue Colour 3 bucket
6 Labour for painting sum
7 Hand Rail for Ramp 2 point
8 Tarpaulins 18 meters
Water sum
TRANSPORTATION OF ITEMS sum
TOTAL
With Holding Tax 5%
Grand Total