CLOSING DATE AND TIME: 17 DECEMBER 2022 – 23:59 Hrs NIGERIA TIME
UNITED NATIONS HIGH COMMISSIONER FOR REFUGEES (UNHCR)
REQUEST FOR QUOTATION No: RFQ/HCR/NIGOG/22-019 FOR SUPPLY AND DELIVERY OF ICT MATERIALS FOR UNHCR ADIKPO FIELD OFFICE

INTRODUCTION TO UNHCR
The Office of the United Nations High Commissioner for Refugees (UNHCR) was established on December 14, 1950 by the United Nations General Assembly. The agency is mandated to lead and co-ordinate international action to protect refugees and resolve refugee problems worldwide. Its primary purpose is to safeguard the rights and well-being of refugees. It also has a mandate to help stateless people. In more than six decades, the agency has helped tens of millions of people restart their lives. Today, a staff of some 10,966 people in more than 128 countries continues to help about 65.6 million persons. To help and protect some of the world’s most vulnerable people in so many places and types of environment, UNHCR must purchase goods and services worldwide. For further information on UNHCR, its mandate and operations, please see http://www.unhcr.org

(1) REQUIREMENTS
The Office of the United Nations High Commissioner for Refugees (UNHCR) in Sub Office Ogoja invites qualified suppliers to make a firm offer for the FOR SUPPLY AND DELIVERY OF ICT MATERIALS FOR UNHCR FIELD OFFICE ADIKPO More details on the required goods and/or services are provided in the attached Schedule of Requirements (Annex A).

Notes: Partial offers are acceptable per school/location.

Partial offers are accepted per items/locations UNHCR reserves the right to approach one or more Bidders in order to establish multiple Frame Agreements having been awarded as a result of this tender and negotiate directly with the Supplier(s) to cater to future requirements of UNHCR or any other UN agencies. The successful Bidder shall accord the same prices and terms to other United Nations Agencies, Funds and Programs that wishes to avail itself of such terms. It is strongly recommended that this Request for Quotation and its annexes be read thoroughly before submitting your offer. Failure to observe the procedure laid out in this document may result in disqualification from the evaluation process.

This document is not to be construed in any way as an offer to contract with your firm.

REQUEST FOR CLARIFICATIONS

We would appreciate receiving your quotation by email to the following email address:

nigogsupply@unhcr.org on or before 17/12/2022

If you require any further clarification on this request, please contact nigogsupply@unhcr.org; on or before 15/07/2022- 11:00am.

Please indicate in the e-mail subject field:

  • RFQ/HCR/NIGOG/22-019
  • Name of your firm
  • Number of e-mails that are sent (example: 1/2, 2/2)

Your quotation must be valid as least for 90 days. The standard payment terms of UNHCR are 30 days upon satisfactory delivery of goods or services and acceptance thereof by UNHCR.

UNHCR will compile the questions received and will respond to all Bidders participating in the tender competition, shortly after the query deadline. Pls indicate time and date for query deadline.

S/NoItem DescriptionSpecificationsUnit Quantity
1Cat 6E CableDlink / Dintek Cat6E UTP Cables 305 metres rollRoll8
2Cat 6E CableDlink / Dintek Cat6E STP Cables 305 mteres rollRoll1
3Patch Panels 24-portsDlink / Dintek – Patch Panels 24-portsPcs2
4Double Power Sockets (13A)Legrand Power sockets (13 A) Pcs30
5DOUBLE BACKBOXDOUBLE BACKBOX [620817] BACK BOX FOR MOUNTING
BRITISH STANDARD WIRING ACCESSORIES – DEPTH 25 MM – 2 GANG – DOUBLE SHALLOW-Legrand
Pcs30
6Patch Cords 0.5mDlink / Dintek Cat6E UTP Cables Length Cbale – 0.5mPcs30
7Patch Cords 3mDlink / Dintek Cat6E UTP Cables Length of cable 3mPcs20
8Legrand Double Data SocketsSINGLE FACEPLATE, [617091] DATA SOCKET BELANKO – RJ 45 CAT. 6 UTP  – LegrandPcs30
9SINGLE BACKBOXSINGLE BACKBOX [620816] BACK BOX FOR MOUNTING
BRITISH STANDARD WIRING ACCESSORIES – DEPTH 25 MM – 1 GANG – SINGLE SHALLOW-Legrand
Pcs20
10Legrand Trunking materials 105X50 UNIVERSAL TRUNKING [010464] UNIVERSAL TRUNKING WITHOUT PARTITION 50 X 105 MM – 85 MM COVER – 2 M-LegrandPcs140
11Legrand Floor TrunkingLegrand Floor TrunkingPcs4
12Trunking Materials end coversLegrand trunking materials End CoversPcs10
13Server room Raised floor materials HPL Coated Wood Core Raised Floor System + accessories (Fire proof)Pcs 48
14Panel LifterDouble Cup Suction panel lifter Pcs 1
15Casio KL 120 Labeling tapeCasio KL 120 Label Tape;  Size 12mmPcs 3
16Conduits PVC pipes2 inches pressure pipePcs 30
17Conduits PVC pipes3 inches pressure pipePcs 2
183 inches PVC elbow3 inches PVC elbowPcs 4
193 inches PVC Tee3 inches PVC TeePcs 4
203 inches PVC end Cap3 inches PVC end CapPcs 4
212 ½ inches PVC elbow2½ inches PVC elbowPcs 4
222½ inches PVC Tee2½ inches PVC TeePcs 4
232½ inches PVC end cap2½ inches end capPcs 4
24Electrical CableCometstar – Electrical Cable, 3 core flexible 4 Sq. mmRoll3
25Earth rod (Electrical grounding)Earth Rod and Clamp ( Pure Copper)Pcs3
2610mm Single Core Cable (Yellow)10mm Single Core  pure Copper Cable (Roll) x 100m (Yellow)Length(m)1
27Screws (250 pcs per packet)Star Screw (80mm)Pkt2
28Electrical tool boxFERVI 0105 – Tool box with tools and accessories (162 pcs.) (Adikpo Office)Set1

Click to Download Document