DEADLINE: 23RD FEBRUARY, 2023
UNITED STATES PHARMACOPEIAL CONVENTION (USP)
REQUEST FOR PROPOSAL (RFP) FOR CALIBRATION OF LABORATORY EQUIPMENT FOR NATIONAL INSTITUTE FOR PHARMACEUTICAL RESEARCH AND DEVELOPMENT

DUE DATE: 23 February, 2023
REFERENCE: Calibration of Laboratory Equipment for National Institute for Pharmaceutical Research and Development
Delivery Location: NIPRD Abuja NigeriaAddress: Plot 942, Cadastral Zone C16, Idu Industrial District.

Dear Sir / Madam:

The US. Pharmacopeial Convention (USP) is a scientific nonprofit organization that sets standards for the identity, strength, quality, and purity of medicines, food ingredients, and dietary supplements manufactured, distributed, and consumed worldwide. USP’s drug standards are enforceable in the United States by the Food and Drug Administration, and these standards are used in more than 140 countries.

USP/PQM+ intends to calibrate several laboratory equipment’s for NIPRD (list of equipment on Annex B of RFP).

You are kindly requested to submit your proposal for the service of Calibration of Laboratory Equipment as attached to Nigeria Procurement@usp.org.

The under listed under Annex B are equipment that would be required for calibration. Your quotation should be sent on or before 24 February, 2023 by 10:00 am. Questions pertaining to this RFP must be received no later than 20 February, 2023 at 12:00PM. Responses to all questions received will be forwarded to all participating bidders on the same day.

All inquiries should be submitted via email to Nigeria Procurement@usp.org

Qty.Minimum equipment requiredUnit costAmount
 included to RFP is Equipment List on Annex B  

PURPOSE AND OBJECTIVE(S):

  • Support calibration and qualification of equipment in Microbiology and NIPRD Central Laboratory

THE HOW

  • Employ the services of a competent, qualified, and accredited calibration organization
  • Calibrate and qualify the listed equipment in microbiology and central laboratory of NIPRD, Abuja

PQM+ NIGERIA EXPECTATIONS

  • Enhance the testing capacity of NIPRD using calibrated and qualified equipment.
  • See attached list of Equipment – RFP Mail

CONTRACTOR’S RESPONSIBILITIES

  • Calibrate and qualify the listed equipment at NIPRD permanent site in Abuja.

CONTRACTOR’S QUALIFICATION AND EXPERIENCECurrent accreditation to ISO/IEC 17025:2017 with relevant scopes to equipment / instrument to be calibrated and qualified.

DELIVERABLES

  • Calibration certificates for all the equipment on the list

Calibration labels for all equipment calibrated and qualified.

CONDITIONS
Pricing TermsAll prices must indicate if VAT is inclusive and must be stated separately
Validity of Quotation30 DAYS

60 DAYS

90 DAYS
Completeness of quotation with full description of work to be donePartial bids permitted per item
Performance periodStart Date: TBD            

End Date:
General Terms and Conditions 
Necessary Conditions 
Required Documentation(1) Company Profile

(2) Company Registration with Corporate Affairs Commission (CAC – C02 and C07)

(3) Company Tax registration with TIN.

(4) Evidence of Past supplies done with reference details

(5) Certification and licenses.

REQUIREMENTS      

Language: All documents submitted in response to this RFP, as well as all correspondence in connection with the RFP shall be in English language.

Inquiries: All inquiries concerning this RFP and any return bid(s) must be submitted in writing. Such inquiries shall be sent by email to: Nigeria_Procurement@usp.org no later than 8 February, 2023 at 12:00 noon. USP is under no obligation to consider or respond to questions that are not received in a timely manner.

Bid Submission:  Bids are to be submitted via e-mail to Email: Nigeria_Procurement@usp.org firms are under no obligation to prepare or submit offers in response to this RFP and do so solely at their own risk and expense. USP will not reimburse any costs incurred related to this RFP. Bids shall be submitted on the Bid Submission Form (Annex A) accompanying this Request for Bid. The terms and conditions of any award and supply Contract resulting from this RFP will be based on the Terms and Conditions included above in the RFP.

Form and Content of Bids: All bids must be in writing, in English language, and signed and dated by an authorized employee of the bidder. Bidders must use the Bid Submission Form provided in Annex A of this RFP. The Bid Submission Form should be fully completed, with all the information required therein (Note: in case of a discrepancy between per unit and total prices, the per unit cost shall govern, and the total will be corrected by multiplying the per unit cost by the specified quantity).

List of Equipment for calibration is on Annex B

BID EVALUATION   

Evaluation: All bids received by USP will be evaluated using a two-stage evaluation process as described below:

Stage 1: All bids must be complete and adhere to the terms and conditions of the RFP. A bid will be deemed complete and compliant if the bid is signed, meets supply and service specifications, is valid for at least 30 days, and is substantially responsive to the terms and conditions of the RFP.

Stage 2: The bid that is complete and offers the best value for money rather than merely the lowest price bid. The principal evaluation factors will be:

(a) The firm’s responsiveness and compliance with the RFP requirements and conditions (10%).

(b) The quality of firm’s past performance in comparable and/or similar service (40%).

(c) Price (50%): A Firm with the lowest total price will be awarded 50 points.

(d) Rejection and Award Procedure:

USP is not bound to accept the lowest or any bid and reserves the right to accept any bid in whole or in part and to reject any or all bids without assigning any reason therefor and to Contract on any of the terms offered or on different terms. Circumstances in which rejection of all bids may occur include, without limitation, the following:

(1) none of the bids are adequately responsive to the request,

(2) there is evidence of insufficient competition, or

(3) the lowest bid exceeds the estimated value or funds available by a significant amount.

USP will send a Notice of Award to the winning bidder(s).     

ANNEX B

LIST OF EQUIPMENT FOR CALIBRATION

SNNAME OF EQUIPMENTMANUFACTURERMODELSERIAL NO
1FridgeWestpoint TropicalWRR-347GXHC165
2Thermo HygrometerDigi Sense20250-31140909281
3Thermometer (Digital)Testo Germany10651079971704
4Thermostat OvenNilNILNIL
5AnalyticalBalanceOhaus AdocutunerAR21401228330587
6Thermo HygrometerDigi Sense20250-31150821029
7StopwatchFisher Scientific66625611755833170471147
8Thermo HygrometerDigi Sense20250-31150821022
9Thermo HygrometerDigi Sense20250-31170416312
10Analytical Weight SetTroemner40000200134000020013
11AnalyticalBalanceOhausCorporationPA224CB72932910
12RefrigeratorHaier ThermocoolHRF750D XBM0020Z3X0 OBHEI20364
13Micro PipetteNilNILNIL
14 Micro PipetteNilNILNIL
15 IncubatorGenlab MINI/75/F/DIGY7H072 
16IncubatorKarl KulbBM 500D593.0573
17Biosafety CabinetBiobase11231BBC86BSC31A20102046
18Double Beam UV SpectrometerSearchtech Instruments British StandardL7082022010121120009
19MicroscopeOlympus107BN001957
20MicroscopeOlympus107BN001820
21AutoclaveSurgi FriendSM280ENILPOORLY
22AutoclaveLabfreez4SA-V50HG1210406174-002
23AnalyticalBalanceOhausAR21401228330590
24CentrifugeCeNILNIL
23Vortex MixerQls(Quality Lab Systems)MX-2500VB5C026974
26Hot Air OvenGallenkamp3A 4073OBV300110J
27Colony CounterStuartSC6+R570001471
28Micropipettes 50-300ulFisherbrandNILNIL
29Micropipettes 0-100 UlMicroplusNIL50153324
30Micropipettes 100-1000 UlNilNILYM3K016037
31Water BathHospibrandNILNIL
32HplcSwmadzu JapanCTO20ACL2021450386 5AB
33HplcAgilent1100 SERIESJP73106757L
34Uv SpectrometerCarry60G6860AMY15140027
35Thermo HygrometerDigi SenseNILNIL
36Digital TachometerDigi Sense20250-26170126731
37ThermocoupleDigi Sense86460-01170527048
38PH MeterMettler Toledo4.0.1B719086801
39StopwatchFisher ScientificNIL170291545
40Thermo HygrometerNilNILNIL
41RefrigeratorLgGC-131SL204TRDP1F594
42Incubator 3 PhaseMemmertNILNIL