CENTRAL SECURITIES CLEARING SYSTEM (CSCS) PLC
REQUEST FOR PROPOSAL FOR THE RENOVATION OF ARCHIVE FACILITY
REFERENCE NO.: CSCS/SBD/RAF/08/2023

The return date for responses against this RFP is August 21, 2023, delivered in the requested manner and to the address advised. Late responses will not be considered. Note that proposals submitted that do not meet stipulated criteria shall be disqualified

TITLE: Renovation of Archive Facility

Ref: CSCS/SBD/RAF/08/2023

You are invited to submit your proposal against the requirements detailed in the Request for Proposal (RFP) attached. The information contained within this invitation shall be treated as “Commercial in Confidence” and shall also be subject to the terms of any related Non-Disclosure Agreement signed by the parties.

Part 1 of the RFP gives you information about Central Securities Clearing System PLC.

Part 2 is for you to answer and provide details as requested to support your proposal.

Proposers are requested to provide one copy of their proposal in paper format and one copy in electronic format (either Microsoft Office or PDF). Submissions to this RFP must be returned by the time stated. Late submissions will not be considered by Central Securities Clearing System Plc.

Queries

All queries should only be directed to the undersigned. We look forward to your responses soon.

Yours faithfully,

Procurement

iodunsi@cscs.ng

Project Scope

Proposed system specification is given below. 

S/NoDESCRIPTION OF WORKQUANTITYUNIT
1Termination of sockets on wall surfaces22Nr
2Replacement of square board lights7Nr
3Replacement of circular board lights5Nr
4Replacement of horizontal oval lights on walls5Nr
5Maintenance of direct extractor cables3Nr
6Replacement of Water closet system4Nr
7Replacement of wash hand basins4Nr
8Replacement of toilet doors4Nr
9Replacement of toilet tiles112Sqm
10Work on AC pipes SUM
11Replacement of Aluminium windows8Nr
12Replacement of 900mm doors in Boy Quarters7Nr
13Work on the Entrance Slab SUM
14Replacement of manhole concrete covers5Nr
15Cleaning of roof SUM
16Cleaning of Windows and partitions SUM
17Painting of Internal & External walls1862Sqm
18Refurbish Entrance gate SUM
19Structural work on cracking toilet wall SUM
20Work on 1m wall foot to curb dampness (Tapoline) SUM
21Work on water leak, suspected plumbing issue SUM