DEADLINE: 21ST SEPTEMBER, 2023
NIGERIA LNG LIMITED (NLNG)
INVITATION FOR EXPRESSION OF INTEREST (EOI) FOR:
PACKAGE A: CALL-OFF CONTRACT FOR GTS-1 PIPELINES EMERGENCY RESPONSE AND MAINTENANCE SERVICES
PACKAGE B: CALL-OFF CONTRACT FOR GTS-1 PIPELINES PROJECT WORKS
PACKAGE C: CALL-OFF CONTRACT FOR GTS-1 PIPELINES PIGGING AND ALLIED SUPPORT SERVICES

1. INTRODUCTION
Nigeria LNG Limited (NLNG) plant complex located on Bonny Island, Rivers State, Nigeria, consists of six natural gas liquefaction trains with a total capacity of 22 million tonnes of Liquefied Natural Gas (LNG) and five (5) million tonnes of Natural Gas Liquids (NGL) per annum. To ensure full utilisation and continuous operation of the plant complex, the Gas Transmission System (GTS) comprising GTS 1-5 pipelines are fully dedicated to providing feed gas to the plant.
The NLNG-owned and operated Gas Transmission System, GTS-1 pipelines which is approximately 201kilometres long transports gas from the gas supplier’s sites in Obite, Obiafu and Soku to Bonny where the LNG plant is located. It is made up of five pipelines with nodes junctions at Ubeta and Rumuji (refer to Table 1 below).

Table 1 – GTS-1 Pipelines Detail

FromToApprox.
Length (km)
Diameter (Ins)*Wall Thickness (mm)*Wall Thickness (mm)*Wall Thickness (mm)
ObiteUbeta12208.29.411.9
ObiofuUbeta30249.811.814.3
UbetaRumuji 332811.413.815.6
SokuRumuji 412811.413.815.6
Rumuji Bonny863614.717.721.4

2. PACKAGE A: CALL-OFF CONTRACT FOR GTS-1 PIPELINES EMERGENCY RESPONSE AND MAINTENANCE SERVICES
The scope of this Pipeline Emergency Response/ Repair works and Maintenance services includes but not limited to the following:
a. Emergency response, pipeline leak repairs/maintenance works at GTS-1 Nodes, GTPs and RoW;
b. Pipeline integrity testing, pipeline recommissioning works at GTS-1 Nodes, GTPs and RoW;
c. Quality Assurance, Inspection, sidescan sonar survey/protection works at GTS-1 River Crossings and RoWs
d. Pipeline preparation, mechanical, welding/ blasting at GTS-1 Nodes, RoW and GTPs
e. Allied services, dredging, erosion control, shore/pipeline road crossings protection Works at GTS-1 Nodes and RoW.

The Emergency response, repair and maintenance works generally consist of all the work necessary for the successful completion of the repair of damaged or leaking pipeline section(s) whether on dry land, swamps or river crossings. This includes community and security engagements, safe transportation of personnel and equipment through various terrains, testing and re-commissioning of the repaired pipeline or other section of the system; initial reconnaissance of the site, mobilisation of personnel and equipment to the site; containment of the site including nitrogen purging, excavation, trenching, clamping (when applicable), hot or cold cut out and replacement of the pipeline sections (when applicable), welding, NDT, HSS coating, hydrotesting (where required), lowering-in, back- filling and re-instatement of the site. Additionally, there might be other types of emergencies such as deformation of pipe, jammed pig etc., which could affect the integrity of the pipeline to be considered in the scope of the contract.

3. PACKAGE B: CALL-OFF CONTRACT FOR GTS-1 PIPELINES PROJECT WORKS
To support its operations/production objectives, NLNG intend to provide a call-off contract to execute multi-disciplinary modification work within the GTS-1 nodes (Ubeta and Rumuji), Gas Transfer Points (GTP Obite, Obiafu and Soku) and along the GTS-1 Right of Way (ROW)

The scope includes, but not limited to, description in the Table 2 below:

Table 2-Package B (Scope of Work)


1. Civil Works
i. Concrete works
ii. Formwork and reinforcement
iii. Structural steelworks
iv. Asphalt works
v. Inspections and Testing.
vi. Geo-Technical Investigations
vii. Survey works
2. Mechanical/Piping/Pipeline Works
i. Fabrication
ii. Process Piping/Pipeline Welding
iii. Inspections and Testing
iv. Equipment Integration & Commissioning
v. Post Weld Heat Treatment
vi. Pressure Testing/Hydro Testing
vii. Commissioning
3. Electrical Works
i. Cable Laying and Terminations
ii. Cathodic Protection Works
iii. Inspections and Testing
iv. Equipment Installation and Integration
v. Electrical Installation Works
vi. Commissioning
4. Instrumentation Works
i. Field Instrument Installation
ii. Cable Laying and Termination
iii. Inspections and Testing
iv. Instrumentation equipment Integration
v. Commissioning
5. Scaffolding & Fabric Works
i. Blasting & Painting
ii. Hot and Cold Insulation
iii. Fireproofing
iv. Scaffolding
6. Minor Engineering/Design Works
i. Mechanical/Piping procurement
ii. Instrumentation and Electrical procurement iii. Structural steel
iv. Survey, Minor Engineering and Design works

The contractor will provide contract management services to cover the following activities/scopes:

  • Construction and Execution Management
  • HSE Coordination and Management
  • Community Relations Management
  • Cost Estimating
  • Quality Assurance and Control
  • Contract Management and Project Control
  • Minor Engineering and Design Services
  • Technical Services/Provision of Specialists/Skilled Resources
  • Procurement Management
  • Inspection services
  • Pre-commissioning and Commissioning.

4. PACKAGE C: CALL-OFF CONTRACT FOR GTS-1 PIPELINES AND ALLIED SUPPORT SERVICES
The scope of this package involves pipeline pigging (both Routine and Intelligent Pigging) and allied support services including inspection and remediation/maintenance works on the valves of the GTS-1 pipeline network & associated appurtenances.

5. PRE-QUALIFICATION INFORMATION
Interested vendors shall be required to submit the documentation in the Table 3 below:
Table 3 – Prequalification Requirements for Packages A, B & C

S/NPREQUALIFICATION INFORMATIONPACKAGE APACKAGE BPACKAGE C
1Respondent’s confirmation of interest to participate in the pre-qualification exercise ✔ ✔ ✔
2Certificate of Incorporation and CAC documents (forms CO2 and CO7). ✔ ✔ ✔
3Health Safety & Environment Policy and Quality Policy. ✔ ✔ ✔
4Current/Valid relevant certificates to operate and to do business in the Nigerian oil and gas industry and must have the Midstream and Downstream Oil and Gas Industry Service Permit (MDOGISP) as issued by the Nigerian Midstream and Downstream Petroleum Regulatory Authority (NMDPRA). ✔ ✔ ✔
5Company profile, organisation, size and structure, including any parent, technical partnership, alliance or joint venture of companies to whom they belong, together with CV of the vendor’s management team ✔ ✔ ✔
6A detailed list of relevant experience to the respective package, with evidence for related works within the last 5 years.
Kindly indicate names of clients, location, contact, contract value and/or volume of services provided with evidence (e.g. award letters, contracts, completion certificates, purchase orders, recognition letters etc.).
✔ ✔ ✔
7Three (3) years accounts audited by a licensed accountancy firm which shall be a member of a recognised institute of accountancy. Most recent accounts should not have an end of year date more than 18 months before the time of EOI. ✔ ✔ ✔
8Tax clearance certificates for the last three (3) years ✔ ✔ ✔
9Evidence & documentation supporting compliance with the Nigerian Oil and Gas Industry Content Development (NOGICD) Act 2010 (Refer to Section 6 (Compliance With Nigerian Content (NOGICD Act 2010)) ✔ ✔ ✔

Note:
The sign ✔ indicates the required documentation from vendors per package.
Only companies considered to meet NLNG’s and NCDMB pre-qualification requirements shall receive further correspondence from the Company, including receipt of invitations to tender for the respective packages.

6. COMPLIANCE WITH NIGERIAN CONTENT (NOGICD ACT 2010)
The Nigerian Oil and Gas Industry Content Development (NOGICD) Act 2010 supports, and details expected Nigerian Content deliverables within contracts and projects in the Nigerian Oil and Gas industry.
NLNG is committed to the NOGICD Act 2010 and Nigerian Content Development.

Interested companies shall comply with the provisions of the Nigerian Content Act that relate to the scope mentioned above for both Packages A, B & C and in particular, comply with the minimum Nigerian Content targets for the scope, which are covered in the Schedule of the Act.
Failure to comply with the Nigerian Content Act or demonstrate commitment to Nigerian Content Development shall result in disqualification from this process.

6.1 General Nigerian Content
Requirements For Packages A, B and C
Companies responding to this advertisement are required to submit the following in compliance with the NOGICD Act, 2010 for each package:

a. Documentation to demonstrate that the entity is a Nigerian-registered company. Submission of certified true copies of CAC Forms 2A & 7A (or its equivalent) including company Memorandum and Article of Association. All companies shall be Nigerian Indigenous Service Companies having 51% and above Nigerian equity in the shareholding and ownership structure of tenderer’s legally registered entity in Nigeria by CAMA (Companies and Allied Matters Act).

b. Evidence of registration on the Nigerian Content Development Monitoring Board (NCDMB) NOGIC Joint Qualification System (JQS).

c. Evidence of valid and appropriate Nigerian Content Equipment Certificate (NCEC) for this scope of service.

i. Package A- GTS-1 Emergency Response and Maintenance: Bidders shall provide valid and relevant Category 1,2,3,4 or 5 for Construction and Movable Equipment (EC) group NCEC, demonstrating ownership of Equipment to execute this work-scope.
ii. Package B- GTS-1 Pipeline Project Works: Bidders shall provide valid Category 1,2,3,4 or 5 for Fabrication and Construction (FC) group NCEC, demonstrating ownership of in-country Fabrication facility, capacity and capability to execute work-scope.
iii. Package C- GTS-1 Pigging and Allied Support Services: Bidders shall provide valid Category 1,2,3,4 or 5 for Quality Control, Inspection and Testing (QS) group NCEC for Pigging and Allied Services, demonstrating ownership of in-country capacity and capability to execute this work-scope.

d. The processes and procedures that explain the methodology of how it intends to comply with the requirements of the NOGICD Act 2010 (Nigerian Content Plan) and how to achieve the set target(s) in the schedule of the NOGICD Act and any targets set by the Board.

e. Details of the company’s corporate organisations overall Human Resources structure (management, supervisors, senior & junior skilled officers, etc.), identifying positions, manned/occupied by Nigerian nationals with evidence of type of employment in-country and identifying the positions manned/occupied by other nationals.
f. Proposed organogram for this work scope populated with nationality, qualifications of personnel and years of experience of personnel on the job (attach CV of key finance, operational and technical personnel) including a succession plan in this work scope.
g. A detailed description of the location of facilities and infrastructure (assets, equipment, technical office, and administrative space, storage, etc.) in Nigeria to support this contract, evidence that 50% of all equipment deployed to work by multinational and international companies are owned by the local subsidiaries.
h. Demonstrate willingness to carry out Human Capital Development (HCD) in compliance with the Human Capacity Development guidelines of NCDMB.

7. SUBMISSION OF RESPONSES
Submissions in response to the above Packages shall be completed strictly in accordance with the instructions given in this publication, segregated, and arranged in the order indicated. Failure to submit any of the documents requested herein may result in the disqualification of the company.
The expression of interest documents/requirements for the respective packages should be submitted in electronic copy in PDF format by e-mail to the address indicated in the Table 4 below. Hardcopies shall not be accepted.

Table 4 Submission Details

S/N DescriptionPackage APackage BPackage C
1Email Subject LineConfidential- Expression of interest- Package A: Call-off Contract for GTS-1 Pipelines Emergency Response and Maintenance ServicesConfidential- Expression of Interest- Package B: Call-off Contract for GTS-1 Pipelines Project WorksConfidential- Expression of Interest- Package C: Call-off Contract for GTS-1 Pipelines Pigging and Allied Support Services
2Eol to be
submitted to
GTS1.emergencyresp onse@ning.comGTS1.pipelineproject @ning.comGTS1.palliedsupport @ning.com
3Submission
date
On or before 1600hrs (GMT+1) 21st September, 2023On or before 1600hrs (GMT+1)
21st September, 2023
On or before 1600hrs (GMT+1)
21st September, 2023

Please Note
a. This is not an invitation to tender. Full tendering procedure will be provided to applicants who are successful at this expression of interest, in accordance with NLNG’s pre-qualification procedures.
b. Notwithstanding the submissions of the documents for the expression of interest, NLNG is neither committed nor obliged to include any company and/or associated companies, agents or sub-contractors on any bid list or award any form of contract to any company and/or associated companies, agents or sub-contractors.
c. Please be aware that this invitation to express interest does not guarantee that you will be requested to submit an offer to Nigeria LNG Limited; it does not constitute any form of agreement or contract between our companies.
d. Nigeria LNG Limited shall not be responsible for any cost incurred in responding to this invitation.
e. This advertisement of Expression of Interest shall not be construed as a commitment by NLNG, nor shall it entitle respondents to claim any indemnity from NLNG, Technical Advisers and/or any of its shareholders by virtue of having responded to this advertisement
f. This is a simple invitation for you to express your interest in the indicated work scope and does not warrant any further feedback from NLNG hereafter. If you do not hear from NLNG within 3months of submission of this publication, it should be taken that your application was not successful.

Signed
Management