DEADLINE: 30TH APRIL, 2024
NATIONAL INSTITUTE OF CONSTRUCTION TECHNOLOGY AND MANAGEMENT
UROMI, EDO STATE, NIGERIA
INVITATION FOR PRE-QUALIFICATION AND EXPRESSION OF INTEREST FOR THE IMPLEMENTATION OF 2024 CAPITAL AND ZONAL INTERVENTION (CONSTITUENCY) PROJECTS
1. PREAMBLE:
The National Institute of Construction Technology and Management (NICTM), Uromi, Edo state, a Federal Polytechnic was appropriated funds in the 2024 budget Appropriation Act. The Budget covers provision for goods, training and empowerment and construction activities to be executed in various parts of Nigeria under Capital and Zonal Intervention (Constituency) Projects. The various activities are grouped into LOTS under goods, works and services.
Accordingly, the institutes hereby invites interested and qualified contractors to submit pre-qualification documents for the execution of the projects as listed below.
2. DESCRIPTION OF PROJECT
WORK
| LOT | PROJECT TITLE |
| W1 | Construction/provision of Auto Diagnostic workshop and equipment centre |
| W2 | Construction of Science Laboratory Technology Building (Classrooms/offices with furniture) |
| W3 | Fencing of perimeter site phase 3 (1.7KM X 1.7KMS) |
| W4 | Building and furnishing of police station at Oguro town in Ejigbo local government area of Osun West senatorial district |
| W5 | Rehabilitation and equipping of a comprehensive health centre in Ede |
| W6 | Completion of road and drainage at Eko Ileh, Edo State |
| W7 | Completion of Mini-stadium in Ileh, Edo State |
| W8 | Construction of side drains and asphalting of Ukpoke road spur, Incmen, Ugboha, Esan South Local Government Area, Edo state |
| W9 | Construction of bridge across Ile River in ukhuse Osi, Owan federal constituency, Edo State |
| W10 | Rehabilitation/Reconstruction of roads in Uzebba & other communities in Owan federal constituency, Edo State |
| W11 | Renovation of school buildings in Epe Grammar school. |
| W12 | Construction of inner roads with solar lights in Epe Grammar school. |
| W13 | Renovation of corpers lodge, principal quarters, Renovation and equipping of dinner hall at Epe Grammar school. |
| W14 | Completion of Bob Farm, Wasinmin Alafia town, Ewekoro (lot 1-3) |
| W15 | Construction of inner road with solar street light in Ojomu area. |
| W16 | Construction of inner road with solar light in Ikota area. |
| W17 | Construction and installation of all in one solar street lights in Southern Ijaw Federal Constituency, Bayelsa State |
| W18 | Solar Borehole and All in one Solar street light in Akpankpa/Biase Federal Constituency, Cross River State |
| W19 | Construction of Boreholes in Chanchaga Federal Constituency, Niger State |
| W20 | Provision of Industrial Borehole with installation of overhead tank in Idimu-Agba in Esau North East Local Government Area, Edo State |
| W21 | Construction of a block of six classrooms at Tamogbene Primary, Sagbama/Ekeremor Federal Constituency of Bayelsa State |
| W22 | Construction of community Hall at Ofugbene community, Burutu Federal Constituency |
| W23 | Provision and installation of solar powered borehole and its ancillary works (overhead water) at Ayim Quarters, Igbodo Tank and at Idumu-Obi quarters Akumazi Umucoha, Ika North East LGA, Delta State |
| W24 | Construction of a block of four (4) classroom in Alibagu Primary School, Alihagu-Agbor, Ika South LGA and renovation and complete refurbishment of (2) existing blocks of (4) classrooms in Isenu Primary School, Owere-Olubor, Ika North East LGA Delta State |
| W25 | Construction of quarter guard in Police Area Command, Agbor, Ika South LGA and Construction of Security House at community Centre, Igbodo, Ika North East LGA Delta State |
| W26 | Erosion and Flood control with drainages and culverts in Woda Itekpa Road Yala LGA, Cross River |
| W27 | Provision of All in one solar street in Itega Ekpudu, Yala LGA, Cross River |
| W28 | Construction of township road at Banye, Batagarawa/Charanchi/Rimi Federal Constituency of Katsina State |
| W29 | Provision of Solar Street lights in Quanpan LGA, Plateau State |
| W30 | Construction of 1 block of 4 classroom at Ukhu secondary school, Esan west, Edo central senatorial district |
| W31 | Construction and installation of solar powered streets across selected Federal Constituencies for road lightening. |
| W32 | Construction of market stalls and shops in Ribah Modern Market – Ongoing |
| W33 | Installation of all in one integrated solar powered street lights in Eko-Ileh, Edoh State |
| W34 | Provision and construction of H2GO Nano-Carb Membrane Filtration Technology Solutions in Towns and Villages Along Costal population of Okpe LGA in Delta Central Senatorial District. |
| W35 | Construction and installation of all in one solar street light (Felicity 60watt) for some selected communities of Idumemalu town in Esan West LGA |
| W36 | Construction and repair of soak-away and installation of 3-in-1 Integrated Solar street light at Sapele Prisons in Sapele LGA, Delta Central Senatorial District, Delta State |
| W37 | Construction of Ibil road in Cross River North |
| W38 | Provision of solar powered borehole in selected locations of katang community of Plateau state. |
| W39 | Rehabilitation of some selected schools in Edo Central |
| W40 | Construction of Blocks of Classrooms at Ozalla Secondary commercial school Ozalla, Owan Local Government Area, Edo state |
| W41 | Construction of perimeter fence, borehole, toilets, school desks and assembly hall at Iyambo Secondary School Iyambo, Etsako West LGA, Edo State |
| W42 | Provision and installation of 300/33kva and 300/11kva transformers in some selected communities in FCT. |
| W43 | Construction of modern motor park in Esan North East LGA Edo state |
| W44 | Renovation and furnishing of 5 (Nos) classroom blocks in some selected schools in Aba North/South, Abia State |
| W45 | Drilling of 10Nos Boreholes in selected locations in Ogori/Magongo LGA in Kogi State |
| W46 | Construction, Asphalting, Culverting and Rehabilitation of roads in Afashion and Afewa communit in Edo State |
| W47 | |
| W48 | Construction of solar street lights in yala communities of Cross river state |
| W49 | On-going construction of Ibil Road, Ogoja LGA, Cross river state |
| W50 | Construction and renovation of Emu Onojie Traditional Palace Esan South East and Oria Traditional Palace, Esan South East, Edo State. |
| W51 | Ongoing construction of 1 kilometer farm road and installation of solar powered street lights for some markets across in Umueze Ibusa, Delta State |
| W52 | Construction of ICT centres in Area community High school Owode, Yewa South, ICt Igbesa, Ado-Ode community High Ilara, Iko Grammar School Ikolaje Idiriko and St Stephen High School, Ado |
| W53 | Construction of Robert Isereke Road, Obuguru community, Burutu LGA, Delta State |
| W54 | Erosion control and drainage in Naira and Kobo- Mosum State University Road, Osun West Senatorial District |
| W55 | Construction of Iyuku to Atte road, Akoko Edo, Edo State |
| W56 | Provision and installation of solar street lights in selected communities in FCT senatorial district |
| W57 | Rehabilitation of Afashio/Iyora road, Akoko Edo LGA, Edo State |
| W58 | Rural road construction and rehabilitation across the FCT senatorial district |
| W59 | Installation of solar powered street lights in Amare FCT senatorial district |
| W60 | Provision and installation of solar street lights in Imeke communities in Edo State |
| W61 | Construction of solar street lights across some communities in Kano central, Kano State |
| W62 | Rehabilitation of Ebe road to 89 Mile Markurdi Express, Enugu State |
| W63 | Rehabilitation of rural roads in Benue North West Senatorial district |
| W64 | Ongoing construction and provision of offices storey building for school of management studies, NICTM’s permanent site, Uromi |
| W65 | Ongoing construction and provision of 250 capacity lecture hall, four offices and six toilet at NICTM’s permanent site, Uromi |
| W66 | Ongoing construction and provision of bungalow for engineering design studio at the NICTM’s permanent site, Uromi |
| W67 | Ongoing construction and provision of bungalow for lecture/classrooms and offices at NICTM’s permanent site, Uromi |
| W68 | Ongoing construction and provision of perimeter fencing of 1.7 x 1.7km at the permanent site phase 2. |
| W69 | Construction of 3 bedroom Housing units in Burutu Federal Constituency, Delta State |
| W70 | Completion of Atteh bridge in Akoko Edo Federal Constituency, Edo State |
| W71 | Construction of Saint Jude Water Front Toilet at marine Base, Port Harcourt Federal Constituency, Rivers State |
| W72 | Construction of drainage systems in Ochiri – Elikahia link road in Port-harcourt Federal Constituency I, River State |
| W73 | Construction of classrooms in Kauyen Alufilin Kashu Primary school, Tsamiyar, Kano Central, Kano State |
| W74 | Construction of Islamiyya school at Garin Sarai Cikin Dawakin Kudu LGA, Kano central, Kano State |
| W75 | Construction of classrooms in Madobi Gora Madobi LGA, Kano central, Kano State |
| W76 | Construction of classrooms in Islamiyya school Maikalwa Kumbotso LGA, Kano State |
| W77 | Construction of solar street lights in Idum, Odajie, Egbe, Ogberia communities in Cross River |
| W78 | Construction of new hostel with furniture’s in Epe Grammar School |
LOT 2: B GOODS
B1 Procurement of 3 nos. Motor Vehicles B2 Procurement of Earth Moving Machines/Equipment (Bulldozer, Water Tanker and Tripper) B3 Supply and installation of solar street lights in selected communities in Brass/Nembe Federal Constituency, Bayelsa State B4 Supply and installation of solar street lights in Ogoja/Yala Federal Constituency, Cross River State B5 Supply and installation of 2-in-1 K integrated solar lights in selected streets in Brass/ Nembe Federal Constituency, Bayelsa State B6 Procurement and installation of solar powered street lights in communities in Burutu Federal Constituency. B7 Supply of Mobility operational vehicles at satisfactory condition to be utilized by communities watchers in effective way to tackle the security challenge within Btagwarawa/Charanchi/Rimi Federal Constituency of Katsina state B8 Supply of motorcycles to cease transportation by traders to cushion the effect of subsidiary removal within Batagarawa/Charancha/Rimi federal constituency of Katsina State B9 Supply of Motorcycles and other empowerment equipment in selected communities in Brass/Nembe Federal Constituency, Bayelsa state B10 Provision of instructional materials, textbooks to selected primary schools at Keffen communities of Plateau State B11 Supply of office desks to selected schools in Cross river North Senatorial District, Cross River state B12 Supply of Hospital equipment to selected Health centres in Delta central Senatorial District, Delta State B13 Provision of instructional materials to selected schools in the six Geopolitical zones of Nigeria. B14 Supply of solar street lights in GAKEM cross river North senatorial district B15 Supply and installation of 3-in-1 powered solar street lights at KATANG community, Plateau State for community development and security enhancement. B16 Provision and installation of solar street lights in Edo North Senatorial District, Edo State B17 Provision of instructional materials to selected schools in Ogbara, Sapele and Okpe LGA, Delta State B18 Procurement and installation of all-in-one integrated scolar powered street lights for some markets across the six geopolitical zones B19 Supply and installation of laptop computers to selected ICT centre in selected secondary school in Ota and Ipokia. B20 Supply of relief materials to flood displaced persons to Ogwanja water side towns, sapele LGA, Delta State B21 Procurement and installation of high tech reidmont solar street lights in Etsako, Edo State B22 Supply and distribution of Motorcycles across the selected communities in Kano Central Senatorial District, Kano State B23 Supply and installation solar street lights in selected location in Ebidi, Apagba, Osigbembe, Apakpekho, Iruru villages and communities, Fugar, Edo State B24 Provision of all-in-one solar street light for Obeakpu community in Oyigbo LGA of Rivers State B25 Solar powered street light in selected communities in Osun west senatorial district B26 Supply of essential food and relief materials to women and Elderly in various communities in Lavun, Mokwa, Edati Federal Constituency, Niger State B27 Purchase and distribution of Koronpe Buses, and motorcycles to transport workers in selected communities of Osun West Senatorial district, Osun State
LOT 3: C SERVICES
C1 Training and Empowerment of youths on digital payment/Banking (pos agents) in Mikang/Qua’an shendam LGA Federal Constituency, Plateau State. C2 Training and Empowerment of Youth Through Basic Driving School of Mini Buses for each Rural-Urban Transportation Scheme in Okpe LGA Central Senatorial District. C3 Skill Acquisition Training for Women in some Selected LGA’S in South West. C4 Training and Empowerment of Women and youths in Agricultural Value Chain in Brass/Nembe Federal Constituency, Bayelsa state C5 Capacity Building and Provision of Start up Grants for Youths and Women in Brass/Nembe Federal Constituency, Bayelsa State. C6 Solar Powered Boreholes in Fantuo, Nembe LGA in Brass Nembe Federal Constituency, Bayelsa State. C7 Supply and Installation of 3-in-1 integrated Solar Street Lights in Bomadi/ Patani Federal Constituency, Delta State. C8 Provision of Classroom Funitures for Students in Ika Grammar School, Agbor, Ika South LGA, Delta State. C9 Provision of Solar Powered lights, Flooring and Fencing of Community Centre, Igbodo in Ika North East LGA, Delta State. C10 Skill Acquisition Training for Youths and Women in Ndokwa/Lkwuani Federal Constuency, Delta State C11 Skill development training and business enhancement for micro and small enterprise owners in Akoko Edo Federal Constituency, Edo State C13 Grant for Artisan in Amac Area Council in the FCT, Abuja Senatorial District. C14 Medical Outreach, Testing and Dispensation of Drugs in Selected Communities in Delta Central Senatorial District, Delta State
3. ELIGIBILITY REQUIREMENTS
Interested and qualified contractors are required to submit the following documents for evaluation;
a) Evidence of Certificate of Incorporation issued by Corporate Affairs Commission (CAC) including Forms CAC 1.1 or CAC 2 and CAC7 Business Name is also acceptable for consultancy services;
b) Evidence of Company’s Income Tax Clearance Certificates (or personal income tax certificate where acceptable for the last three (3) years valid till 31st December 2024;
c) Evidence of Pension Clearance Certificate valid till 31st December, 2024 (this requirement is only applicable to bidders whose number of staff is 15 and above).
d) Evidence of Industrial Training Fund (ITF) Compliance Certificate valid till 31st December, 2024 (this requirement is only applicable to bidders whose number of staff is 5 and above or the bidder’s annual turnover is N50m and above);
e) Evidence of current Nigeria Social Insurance Trust Fund (NSITF) Compliance Certificate valid till 31st December, 2024;
f) Evidence of Registration on the National Database of Federal Contractors, Consultants and Service Providers by submission of Interim Registration Report (IRR) expiring on 31/12/2024 or valid Certificate issued by BPP;
g) Sworn affidavit
- disclosing whether or not any officer of the relevant committees of the National Institute of Construction Technology and Management, Uromi, Edo or Bureau of Public Procurement (BPP) is a former or present Director, shareholder or has any pecuniary interest in the bidder and to confirm that all information presented in its bid are true and correct in all particulars;
- That no director has been convicted in any county for any criminal offence relating to fraud impropriety or criminal misrepresentation of falsification of facts relating to any matter.
- That the company is not in receivership, the subject of any form or bankruptcy proceedings of the subject of any form of winding up petition or proceeding
h) Company’s Audited Accounts for the last three years (2021, 2022 & 2023);
i) For supply of Equipment: Letter of Authorization as representative of the Original Equipment Manufacturer (OEMs)
j) Services: evidence of firms’ current registration with relevant regulatory professional body(ies) such as training, evidence of firm’s currents accreditation by the Centre for Management Development (CMD);
k) Reference letter from a reputable commercial bank indicating willingness to provide credit facility for the execution of the project when needed;
l) Company’s profile with the curriculum Vitae of key staff to be deployed for the project, including copies of their academic/professional qualifications such as COREN, QSDRBN, ARCON, CORBON etc;
m) Verifiable documentary evidence of at least three (3) similar jobs executed in the last five (5) years including letters of awards, valuation certificates, job completion certificates and photographs of the projects;
n) Works: List of Plants/Equipment with proof of Ownership/Lease agreement;
o) Only companies included in the National Automotive design and development Councils approved list of Local manufacturers of vehicles or their authorized representatives should bid for vehicle
p) ICT jobs: Evidence of firm’s current registration/accreditation with Computer professionals registration council of Nigeria and National Information technology Development Agency (NITDA);
q) Evidence of current licence issued by Nigerian Electricity Management Services Agency (NEMSA);
r) For Joint Venture/Partnership, Memorandum of Understanding (MoU) should be provided (CAC, Tax Clearance Certificates, Pension Clearance Certificate, ITF Compliance Certificate, NSITF Clearance Certificate, IRR & Sworn affidavit are compulsory for each JV Partner);
Note: All documents for submission must be submitted with a Covering/Forwarding letter under the Company’s letter head paper bearing amongst others, the Registration Number (RC) as issued by the CAC, Contact Address, Telephone Number (preferably GSM No) fax and email address. The letter head paper must bear the Names and Nationalities of the Directors of the company at the bottom of the page, duly signed by the authorized officer of the firm.
Note: No contractor should bid for more than two lots. No contractor should bid for two lots with the same company profile.
4. SUBMISSION OF PRE-QUALIFICATION DOCUMENTS AND EXPRESSION OF INTEREST (EOI)
All applicants are to submit Pre-qualification documents/EOIs for each of the Lots desired in two hard copies each packaged in sealed envelopes and clearly marked “Invitation to Pre-qualification” or “EOI” and addressed to the:
The Rector,
The National Institute of Construction Technology & Management (NICTM) Uromi, Edo State.
The top left-hand comer of the envelopes shall beat the name of the Project/Lots for which you are applying and the reverse of each sealed envelope shall bear the name and the address of the bidder The documents shall be dropped in Tender Box Marked “TENDER 2023″ in the Procurement Unit not later than 12:00 noon, Tuesday, 30th April, 2024.
5. OPENING OF PRE-QUALIFICATION DOCUMENTS
The EOI and the Pre-Qualification documents shall be opened immediately after the deadline for submission at 12:00 noon, Tuesday 30th April, 2024, at the Institute’s Board Room in the presence of Observers, Bidders or their representatives.
6. GENERAL INFORMATION
a. All submitted documents shall be referred to relevant agencies for verification
b. This advertisement shall not construed as a commitment on the part of the institute to award contract to any contractor, nor shall it entail any contractor/supplier submitting documents to claim any indemnity from the institute.
c. Arrangement of technical documents, hard copy should follow in the order of the listed indicated above and should have a table of contents indicating the pages where the items could be found. Failure to comply with this directive will result in the disqualification of the bidder
d. All cost will be borne by the bidders;
e. Bidders can submit through Post (Courier Services)
f. The EOIs/technical bids will be opened in the presence of CSOs and Professionals Bodies and covered by video recording; invitation link will be sent to bidder who choose to join the bid opening online;
g. Works & Goods: Only pre-qualified bidders at technical evaluation will be invited at later date for collection of tender documents;
h. Services: Only Shortlisted firms will be invited at a later date for collection of Request for Proposals;
i. The National Institute of Construction Technology and Management is not bound to prequalify and bidder reserves the right to annul the procurement process at any time without incurring any liabilities in accordance with section 28 of the Public Procurement ACT 2007.
Signed:
Procurement Officer
For Rector.
