DEADLINE: 13TH FEBRUARY, 2026
INTERNATIONAL CENTRE FOR ENERGY, ENVIRONMENT AND DEVELOPMENT (ICEED)
REQUEST FOR QUOTATION FOR THE DEPLOYMENT OF SUSTAINABLE SOLAR PV SYSTEMS FOR PRODUCTIVE USE OPPORTUNITIES IN THE LABORATORY COMPLEX OF THE STANDARDS ORGANIZATION OF NIGERIA AND SELECTED SMALL AND MEDIUM ENTERPRISES
TENDER NOTICE FOR THE SUPPLY AND INSTALLATION OF:
I) 200KWP SOLAR PV HYBRID SYSTEM AT STANDARDS ORGANIZATION OF NIGERIA LABORATORY COMPLEX, OGBA, LAGOS;
II) 50KWP SOLAR PV HYBRID SYSTEM AT A SELECTED SME CLUSTER IN EKITI STATE; AND
III) 50KWP SOLAR PV HYBRID SYSTEM AT A SELECTED SME CLUSTER IN KANO STATE

The International Centre for Energy, Environment and Development Foundation (ICEED Foundation) is committed to the goal of poverty eradication. We deliver this commitment by providing the evidence base for reforms and influence that shape Nigeria’s climate and energy security. ICEED Foundation is leading efforts to expand access to clean and sustainable energy solutions for public institutions and micro, small and medium scale clusters across Nigeria. With funding from Deutsche Gesellschaft für Internationale Zusammenarbeit (GIZ) GmbH under the Nigeria Energy Support Programme (NESP), ICEED Foundation is implementing the “DEPLOYMENT OF SUSTAINABLE SOLAR PV SYSTEMS FOR PRODUCTIVE USE OPPORTUNITIES IN THE LABORATORY COMPLEX OF THE STANDARDS ORGANIZATION OF NIGERIA AND SELECTED SMALL AND MEDIUM ENTERPRISES” Project. This project, among other deliverables, seeks to deploy a 200kWp hybrid solar PV electricity system in Standards Organization of Nigeria Laboratory Complex, Ogba, Lagos. This will provide the electricity needs of the AC and refrigerator laboratories as well as enhanced electricity supply for the management office. The project will also deploy 50kWp hybrid solar electricity in two SME clusters in Ekiti and Kano States. This will reduce their energy costs and improve the competitiveness of the SMEs. It will also strengthen institutional capacity for decentralized renewable electricity.

The Project therefore seeks to procure and install the following solar PV equipment and materials:

Lot 1: Equipment and materials for the installation of 200KWp hybrid solar PV system at Standards Organization of Nigeria Laboratory Complex, Ogba, Lagos

S/NDescriptionUnitQuantity
1550Wp Jinko Bifacial Solar Panelper panel380
250KW Deye Inverter, TP&Nper inverter3
3100KWH Deye Li-ion Batteryper battery3
4150MM AC Armored Cable (Comestar)per metre400
570MM DC Solar Panel Cable (Comestar)per metre1,000
6600A AC Switch Gear (ABB), TP&Nper switch3
7125A DC Breakers (Chint)per breaker12
8500A Bus Bar (ABB), TP&Nper bus bar3
9600A Changeover Switch (ABB), TP&Nper switch3
10Lightening Arrestor – 2 sqft mat, 6 mtrs x 3 galvanized rod, 3 bags of industrial salt, 1 bag of iron filings, 1 bags of animal dung, etcPer set3
11EarthingPer set3
12Erection of Base Station consisting of 3600mm x 3600mm Block Structure c/w Furnishing (see figure 1 below for floor plan and elevation)Per structure1
13Surge Protection Device (DC) 125A (Chint)per device6
14Surge Protection Device (AC) 600A, TP&Nper device1
15Installation of carport measuring 67 metres length x 16 metres width and total area of 1072 square metres for the Solar Panel Support Structure (see figure 2 below for sample design)Lot1
16Accessories for installation of the solar PV systemLot1
17Logistics for transportation and delivery to siteLot1
18Labour for installation of the solar PV systemLot1

Figure 1: Floor plan and layout for the Base Station

Figure 2: Carport design for solar panel support structure

Lot 2: Equipment and materials for the installation of 50KWp hybrid solar PV system at MSME Cluster, Ekiti State

S/NDescriptionUnitQuantity
1550Wp Jinko bifacial solar panelper panel105
280KW Deye inverter, TP&Nper inverter1
330KWH Deye li-ion batteryper battery2
425MM AC Cable (Comestar)per metre5
525MM DC Solar panel cable (Comestar)per metre800
6200A AC Switch gear (ABB), TP&Nper switch2
7125A DC breakers (Chint)per breaker6
8200A Bus bar (ABB), TP&Nper bus bar2
9200A Changeover switch (ABB), TP&Nper switch3
10Lightening arrestor – 2 sqft mat, 6 mtrs x 3 galvanized rod, 3 bags of industrial salt, 1 bag of iron filings, 1 bags of animal dung, etcPER SET2
11EarthingPER SET2
12Erection of base station consisting of 3600mm x 3600mm block structure c/w furnishing (as per specification in Lot 1)Per structure1
13SURGE PROTECTION DEVICE (DC) 125A (Chint)per device6
14Surge protection device (AC) 200A, TP&Nper device1
15Accessories for installation of the system (note that the solar panels will be roof mounted)Lot1
16Smart metering system c/w digital set up infrastructure. The smart meter to be deployed will be 230V 10A STS compatibleper unit50
17Logistics for transportation and delivery to siteLot1
18Labour for installation of the solar PV systemLot1

Lot 3: Equipment and materials for the installation of 50KWp hybrid solar PV system at MSME Cluster, Kano State

S/NDescriptionUnitQuantity
1550Wp Jinko bifacial solar panelper panel105
280KW Deye inverter, TP&Nper inverter1
330KWH Deye li-ion batteryper battery2
425MM AC Cable (Comestar)per metre5
525MM DC Solar panel cable (Comestar)per metre800
6200A AC Switch gear (ABB), TP&Nper switch2
7125A DC breakers (Chint)per breaker6
8200A Bus bar (ABB), TP&Nper bus bar2
9200A Changeover switch (ABB), TP&Nper switch3
10Lightening arrestor – 2 sqft mat, 6 mtrs x 3 galvanized rod, 3 bags of industrial salt, 1 bag of iron filings, 1 bags of animal dung, etcPER SET2
11EarthingPER SET2
12Erection of base station consisting of 3600mm x 3600mm block structure c/w furnishing (as per specification in Lot 1)Per structure1
13SURGE PROTECTION DEVICE (DC) 125A (Chint)per device6
14Surge protection device (AC) 200A, TP&Nper device1
15Accessories for installation of the system (note that the solar panels will be roof mounted)Lot1
16Smart metering system c/w digital set up infrastructure. The smart meter to be deployed will be 230V 10A STS compatibleper unit50
17Logistics for transportation and delivery to siteLot1
18Labour for installation of the solar PV systemLot1

Please note the following:

  • All the installations are expected to be successfully completed not more than 30 calendar days from the date of award of contract.
  • ICEED Foundation technical team will be on ground across the 3 locations to oversee the installations and provide onsite technical support.

BIDDING FOR THE LOTS
Interested companies should submit tenders for the Lot that they are interested in implementing. A company can bid for more than one Lot in separate tenders. For companies bidding for more than one Lot, they have to demonstrate the capacity to deliver the installations within the stipulated 30 calendar-day period. Each tender should clearly state the Lot number and description. In addition, all tenders must clearly state the validity period.

ELIGIBILITY CRITERIA
Interested companies must:
a) Be a registered company in Nigeria with evidence of registration with the Corporate Affairs Commission and other relevant registration bodies.
b) Have a Tax Identification Number. Please note that at the point of payment, ICEED Foundation will deduct Withholding Tax in accordance with federal government regulations and remit same to the Nigeria Revenue Service.
c) Have a minimum of 5 years experience in the supply and installation of hybrid solar mini grid systems. Evidence of similar assignment must be presented.
d) Evidence of permit from the Nigeria Electricity Regulatory Commission (NERC) to install solar mini grids.
e) Provide evidence of compliance with Nigerian Environmental and Social Management System (ESMS) standards, including worker codes of conduct.
f) Have qualified staff, including a COREN (Council for the Regulation of Engineering in Nigeria) registered Electrical Engineer.
g) Have at least one technical personnel certified by the Nigerian Electricity Management Services Agency (NEMSA).
h) Present audited financial statements for the past 3 years showing positive net worth.
i) Have the specified equipment and materials in stock or demonstrate ability to deliver within the required timeframe.
j) Be able to provide advance payment guarantee if selected to undertake the assignment.

QUESTIONS
Specific questions about this tender and application can be sent by email to info@iceednigeria.org. ICEED Team will be available to respond to questions sent on or before Friday 07 February 2026. Questions sent after this date will not be entertained. ICEED reserves the right not to respond to questions that undermine the integrity of the competitive bidding process. Contact between bidders and ICEED team is prohibited. If contact is established, the bidder may be disqualified from the process.

SUBMISSION
The method of submission is detailed below:
Soft copy of the bid documents can be submitted to; procurement@iceednigeria.org with nkemdirim@iceednigeria.org; ewah@iceednigeria.org; segun@consistent-energy.com and oloye@iceednigeria.org in the copy. The heading of the email should be Bid for supply and installation of hybrid solar PV systems under the ICEED/GIZ/NESP Project. The bid documents should be in a zipped folder and clearly labelled with the Lot number. The technical and financial bids must be prepared as separate documents in one zipped folder. Only bids submitted in the prescribed form and deadline will be considered.

Please note again that if a company is bidding for more than one Lot, they will have to submit separate bids for each of the Lots.

DEADLINE FOR SUBMISSION OF BIDS
The deadline for submission is Friday 13 February 2026 by 1700 hours.

Signed
Nkemdirim Agbo
Head of Procurement, ICEED Foundation