DEADLINE OR 20-APR-2026 09:59 (GMT 1.00)
UNITED NATIONS HIGH COMMISSIONER FOR REFUGEES (UNHCR)
INVITATION TO BID FOR THE RENOVATION AND INSTALLATION OF SOLAR SYSTEM AT YELEWATA PRIMARY SCHOOL, BENUE STATE
REFERENCE: UNHCR ITB 2638
BENEFICIARY COUNTRIES OR TERRITORIES NIGERIA
REGISTRATION LEVEL: BASIC

Description

Background
Yelewata Primary School in Benue State requires essential renovation works and the installation of a reliable solar power system to improve learning conditions, enhance safety, and ensure uninterrupted access to electricity. This project aims to address structural deterioration in the school buildings and provide a sustainable, off-grid energy solution that supports lighting, ICT equipment, administrative functions, and overall school operations.

Checking

The Bidder is required to verify the completeness and accuracy of all pages in the BOQ. Should any page be missing, duplicated, or contain unclear figures or text, he/she must immediately notify the designated Contact Person for clarification and correction.

If the bidder is uncertain about the meaning of any word, figure, or description, clarification must be sought from the Contact Person before the tender submission date.

No liability will be accepted, nor any claim entertained, for errors in the tender arising from mistakes in the BOQ that should have been rectified through the above procedure.

Interpretation of the BOQ

This Bill of Quantities shall be read in conjunction with:

  • All project drawings
  • Technical specifications
  • Contract conditions
  • Any other associated contract documents

In the event of a discrepancy, the Site Engineer’s interpretation shall prevail.

Scope of Work

The Contractor shall execute and complete all works necessary for construction, renovation, finishing, installation, testing, commissioning, and final handover of the facility in accordance with approved drawings and specifications.

Descriptions provided in the BOQ are indicative and shall not limit or reduce the Contractor’s obligation to complete the full scope of works required for proper and satisfactory project completion.