THE FEDERAL REPUBLIC OF NIGERIA
FEDERAL MINISTRY OF AGRICULTURE AND RURAL DEVELOPMENT (FMARD)
AFDB ASSISTED
AGRICULTURAL TRANSFORMATION AGENDA SUPPORT PROGRAM PHASE-1 (ATASP-1)
NATIONAL PROGRAM COORDINATING TEAM (NPCT) ATASP-1 HEADQUARTERS’ ABUJA
IFB-NO: IFB/ATASP-1/K-S PZIU/NCB/WKS/2019/PACKAGES 1(A&B)-2B
LAON NO: 21000150029994
PROJECT ID NO: P-NG-AA-003
INVITATION FOR BIDS
BRIEF DESCRIPTION OF WORKS: CONSTRUCTION OF55.26KM LATERITIC AND DOUBLE COAT SURFACE DRESSED ROADS IN KEBBI STATE, AND 6.62KM LATERITIC AND DOUBLE COAT SURFACE DRESSED ROADS IN SOKOTO STATE AND CONSTRUCTION/REHABILITATION OF 810 HA SURFACE IRRIGATION SCHEMES IN KEBBI STATE

1. This invitation for Bids follows the General Procurement Notice for this project, which appeared in the United Nations development business (UNDB) online Reference No.: AfDB 169-03/15 of 11th March 2015 and on the African Development Bank Group’s Internet Website (www.afdb.org ).

2. The Federal Government of Nigeria has received financing from the African Development Bank toward the cost of the Agricultural Transformation Agenda Support Program Phase – 1(ATASP -1). It is intended that part of the proceeds of this will be applied to payments under the Contract for which this invitation for bids is issued.

3. The national program Coordinating Team (NPCT) now invites sealed bids from eligible bidders for the construction of works grouped in three (3) packages:
– 1- Construction of 63km double coat surface dressed and lateritic roads in Kebbi & Sokoto States, Packages 1A (Lots A1 & A2) & 1B (Lot B1)
– 2- Construction /Rehabilitations of 810 hectares, Packages 2B (Lots B1 & B2) in Kebbi State as described below;

Package 1A- Feeder Roads- Kebbi State

LotDescriptionBid Security Required  (Naira)
A1Yawuri8.41km Giro Masa – Nasarawa Lateritic road, 2.14km Shanga- Dugu-Raha lateritic road, 4.75km Ngaski Wawu lateritic road and 2.87km Ngaski-Gafara lateritic road5,000,000.00
A2Gwandu/Argungu11.20km kaoje – Buya lateritic road, 1.0km Argungu-Dankwalle double coat surface dressed road, 00.093km Sabuwar Tunga double coat surface dressed road, 4.52km Kamba – Tukurwa lateritic road, 2.21km, Goron Tanma-Kamba lateritic road and 15.50km Fakon Sarki Bayawa lateritic Road13,000,000.00

Package 1B- Feeder Roads- Sokoto State

LotDescriptionBid Security Required  (Naira)
B1 Kware4.71km Kware – Marbawa double coat surface dressed road, 1.31km Yarbarade – Kagara Masu lateritic road and 0.6km Hamma Ali Clinic lateritic road5,000,000.00

Package 2A- Irrigation Schemes – Kebbi State

LotDescriptionBid Security Required  (Naira)
B1Dugu Tsoho Irrigation Scheme (shanga L.G.A)Construction  of 2.150km of Water Conveyance Canal, 5.400km main canal, 9.150km secondary canal, 20.155km field roads and various control structure at Dugu Tsoho irrigation Scheme22,000,000.00
B2Gafara Wau IrrigationConstruction of 1.289km main canal, 1.100km secondary canal, 2.35km embankment dyke, 12.61km field roads and various control Structures at Gafara Wawu irrigation Scheme9,000,000.00

Eligible Bidders may bid for one or more of packages. Bidders can submit a combined security of several lots f a package but each package must have a separate bid security.

Complete set of bidding documents for all packages may be purchased at the office address below upon payment of a non-refundable fee of thirty Thousand (N30,000.00) for now lot and fifteen thousand subsequent lot within a package. The method of payment shall be by bank draft or direct transfer only in favour of:
Name of Account: Agricultural Transformation Agenda Support Program
Name of Bank: Central Bank of Nigeria
Account Number: 0020293461048
Account Currency: NGN

4. Interested bidders may obtain further and information and inspect the bidding documents at the address below from 0900 to 1500hrs Mondays through Fridays

5. Bidding will be conducted in accordance with the National Competitive Bidding (NCB) procedure specified in the Procurement Policy for Bank Group-Funded Operations (policy), October 2015 which is available on the Bank’s website at http://www.afdb.org/en/projects-and/operations/procuremnet/new-procedures-policy

6. Bids should be delivered in sealed envelopes to the address and at the time and dates stated below:
Agricultural Transformation Agenda Support Program Phase 1 (ATASP-1)
Zonal Program Coordinator
Kebbi-Sokoto Processing Zone Implementation Unit Akoko Plaza Floor Opposite
Central Bank of Nigeria (CBN), Emir Yahaya Road Birnin –Kebbi, Kebbi State

 Packages A1: Feeder Road- Kebbi State: on or before 2nd /09/2019 at 12:00 noon (local Time)
 Packages 1B: Feeder Road- Kebbi Sokoto: on or before 2nd /09/2019 12:00 noon (local time)
 Packages 2B: Irrigation Schemes- Kebbi State: On or before 4th /09/2019 at 12:00 noon local time
7. Bids must be accompanied with a bid security in the required amount indicated in the table above. Late bids will be rejects

8. Bids shall remain valid for One Hundred and Twenty (120) days after the deadline for bid submission prescribed above

9. The Provision in the instrument to bidder and in the General Conditions of Contract are the provisions of the African Development Bank Standard Bidding Document: procurement of Small Works.

10. Bids will be opened at the same address in the presence of bidder’s representative who choose to attend
National program Coordinator ATASP-1
Agricultural Transformation Agenda Support Phase -1 (ATASP-1)
No. 15 Lord Laggard Street, Asokoro
Abuja, Nigeria
Tel: (234) 8034491496; (234) 8069767735
E-mail: atasphq2019@gmail.com Cc: abulash2014@gmail.com

Naija_business_Information_tenders_contracts