DEADLINE: 25TH AUGUST, 2025
JUSTICE, DEVELOPMENT AND PEACE COMMISSION (JDPC)
C/O  ST PATRICK CATHOLIC CATHEDRAL, OPPOSITE STATE SECRETARIAT P.O.BOX 58 MAIDUGURI, BORNO STATE
RE: REQUEST FOR QUOTATION
FOR CONSTRUCTION OF 28 LATRINES AND 5 SOLID WASTE DISPOSAL DUMPSITES

This is a formal invitation for quotations for the construction of 28 latrines and 5 solid waste disposal dumpsites in Magumeri and Kaga to the JDPI MAIDUGURI Head Office, under the GFFO II funded Project

Note: All quotations must be submitted on or before 16:00pm on 25 August 2025. The quotation received after the deadline will not be considered.

Note:

Terms and Conditions

Please provide the following information in your Quotation:

  • Confirmation that work can be completed within two (2) weeks from receipt of this Job Order
  • Provide your company profile and related documents CAC Registration documents, Valid ID Card, Evidence of tax clearance, SCUML Certificate, Evidence of similar work, COREN Certificate.
  • Price Validity: Note that the unit price specified should be valid for a minimum period of 3 months.
  • Kindly attach comprehensive company profile alongside quotation.

Criteria :

  • Quotation should be sent to:
  • The subject of the mail must be: Request for Quotation JDPC MAIDUGURI HEAD OFFICE- GFFO II-JDPC MAID 19-08-2025-29
S/NSPECIFICATIONS/DESCRIPTIONUNITSQTY
1. Mobilization & Site Prep:
1.1Mobilization of labor, tools, and materials to LGAs 2
1.2Site clearing & pit excavation (1.5m x 1.5m x 2m depth per latrine) Community-skilled labor engaged for excavation 28
2. Substructure Works:
2.1Foundations, concrete beams & pillars (using 8″, 10″, 12mm rods) 28
2.2Blocks: 105 per latrine, Cement: 5 bags per latrinem2105×28
2.3Precast slab cover latrine), reusable planks & wood for formworkpcs2×28
3. Superstructure Works:
3.1Pillars, block walls (140 blocks/latrine), lintel beamspcs140×28
3.2Ramps/steps, wall plastering (2 bags of cement each for wall & floor)bags2×2 8
3.3Frontal privacy walls (100 blocks + 2 bags cement each)pcs100 x 28
 4. Roofing  
4.1Rafters (2×6″, 3 per latrine), Purlins (2×4″, 3 each), metal strapspcs3×28
4.2Roofing nails, galvanized roofing sheets (3 per unit), insect netpcs3×2 8
 Fittings & Visibility 
5.1Doors with internal locks, 100mm PVC vent pipespcs28
5.2200W solar lighting on frontal wallspcs28
5.3Signboards (1.5m x 1.5m) & gender symbols (0.5m x 0.5m)pcs28
6. Hygiene Facilities:
6.128 handwashing stations (50L with consortium/donor logo)pcs28
7. Workers’ Wages
7.1Daily rates for bricklayers,  carpenters, and Iron Benders for 28 Unitspers28
8. Waste Disposal Dumpsites (3 Kaga, 3 Magumeri)
8.1Excavation: 8x8ft, 7ft depth (3ft underground, 4ft above)M35
8.2Block works: 180 blocks per unit, metal rods, binding wireBlocks180 x 5
9.3Cement (6 bags), reusable planks & woods for formworkBags6×5
8.4Labor wages: bricklayers, carpenters, iron bendersPcs5
8.5Visibility signboards (1 per site)Pcs5