ADAMAWA STATE MINISTRY OF WORKS
INVITATION TO TENDER FOR THE CONSTRUCTION OF A PEDESTRIAN BRIDGE ALONG 2.4 KM GALADIMA WAY IN JIMETA ADAMAWA STATE
ADSMOW/WORKS/2026/PROJ/005
ADAMAWA STATE MINISTRY OF WORKS, YOLA.
ADDRESS: STATE SECRETARIAT COMPLEX YOLA ROAD-JIMETA YOLA P.M.B 2024
Introduction
The Adamawa state Ministry of Works and Energy Development wishes to inform all eligible and interested contractors, suppliers and the General public that the Ministry is advertising to undertake procurement for the CONSTRUCTION OF PEDESTRIAN CROSSING/BRIDE ALONG GALADIMA AMINUN WAY JIMETA YOLA ADAMAWA STATE as provided by Adamawa State Bureau of Public Procurement in line with section 8 sub-section 1 (i) of the state public procurement Law of 2020.
Scope of the project
Firms/contractors are to submit Technical and financial bids for the Procurement for the CONSTRUCTION OF PEDESTRIAN CROSSING/BRIDE ALONG GALADIMA AMINUN WAY JIMETA YOLA ADAMAWA STATE and has the scope as follows:
The Scope of works for -50m Span Bolted Steel Pedestrian Bridge
include but not limited to the Following:
(1) Design & Detailing
- Review employer’s requirements and site conditions
- Produce fabrication and erection drawings for steel members and bolted connections
- Design all bolted splices, end plates, cleats, and bracing per Eurocode 3 EN 1993-1-8 or AISC 360
- Issue connection calculations for bolt grade, size, pitch, and slip factor
- Submit IFC drawings for approval
(2) Materials Supply
- Structural Steel: Supply S355J2/S275JR plates, sections, and CHS/RHS to EN 10025. Typical for 50m span: plate girders or Warren truss.
- Fasteners: Supply HSFG bolts Grade 8.8/10.9, matching nuts and washers to ISO 4014/4017, ASTM A325/A490. Hot-dip galvanized to ISO 1461.
- Bearings & Anchor Bolts: Supply elastomeric bearings and holding down bolts at abutments.
- Coating System: Blast to Sa 2.5, apply 3-coat epoxy/Zinc system for C4/C5-M environment. DFT 240-320 microns.
- Documentation: Provide mill certs 3.1, coating reports, bolt test certs.
(3) Fabrication in Workshop
- Cutting, drilling, and assembly of main girders/trusses in segments max 12-15m for transport
- Shop assembly of 1 segment per type to check fit-up and hole alignment
- Welding to EN 1090 EXC3. All welds 100% UT/MPI for critical joints
- Surface prep and painting in controlled environment
- Marking and packing for site delivery
(4) Transport & Site Handling
- Transport segments to site with police escort if oversized
- Offload with crane, store on timber packers above ground
- Protect bolts, bearings, and painted surfaces from damage/corrosion
(5) Foundation & Substructure
- Construct reinforced concrete abutments and piers to line and level
- Install holding down bolts and bearings to tolerance ±3mm
- Cure and test concrete to specified strength before erection
(6) Erection & Installation
- Erect steel segments using mobile crane or launching gantry. 50m span usually done in 3-4 pieces + splice on site
- Align, level, and temporary prop structure
- Install bolted splices using turn-of-nut or torque control method. Snug-tight first, then full preload for HSFG joints
- Install bracing, decking supports, and cross-frames
- Place decking: precast concrete, steel grating, or timber
- Install parapets, handrails, lighting, and drainage
(7) Inspection & Testing
- During fabrication: Dimensional check, NDT of welds, DFT checks
- During erection: Bolt tension checks on 10-20% of connections, line/level survey
- Load test: Static load test to 1.25x design live load if required by client
- Final inspection: Visual, coating thickness, bolt protrusion, sign-off
(8) HSE & QA/QC
- Method statements and risk assessments for working at height and lifting
- Permit to work system for all site activities
- ITP – Inspection Test Plan with hold points for client witness
- As-built drawings and O&M manual handover
(9) Exclusions – Typically
- Geotechnical investigation and piling
- Architectural features like roofing, cladding
- MEP works beyond basic lighting conduit
- Landscaping and approach ramps
Eligibility:
Please Note; that the bids documents will be evaluated on the responsiveness to the following criteria;
(a) Shall be incorporated in Nigeria and have all the legal requirement incorporate in the country – including registration with relevant bodies which include
(b) Certificate of Registration with Corporate Affairs Commission.
(c) Registration as Contractor/Service provider in Adamawa State with Bureau of Public Procurement Valid 31st December, 2026.
(d) Evidence of VAT Registration and Remittance with TIN
(e) Copies of immediate past 3 years Tax clearance certificate (2024,2025 and 2026)
(f) Evidence of immediate past 3 years of company’s audited report (2023,2024 and 2025)
(g) Evidence of compliance with ITF amendment Act 2011 by inclusion of certificate of compliance from the Industrial Training Fund valid till 31st December, 2026
(h) Evidence of compliance with Pension Reform Act 2004 by inclusion of Certificate of compliance from the National Pension Commission valid till 31st December, 2026.
(i) Evidence of compliance certificate with Employees Compensation Act (ECA) 2010 (Registration with NSITF) valid till 31st December, 2026
(j) Must have capability, to commence work without advance payment to the satisfaction of the client.
(k) Bidders shall also submit proposals of work methods and schedule insufficient detail to demonstrate the adequacy of the bidders’ proposals to meet the technical specifications and the completion time.
(l) Ownership of quarry and asphalt plants in the state are key requirements or commitment letter from owners of quarry/asphalt plant for supply of gravels/asphalt
(m) All submissions in response to this advert should be in English language.
(n) Bids must be duly signed.
(o) Contractors must be fully mobilized in the State
(p) Evidence of similar Jobs carried out
(q) A sworn affidavit certifying as follows:
(i) That none of the Directors of the company seeking for pre-qualification/financial has ever been convicted by any court of law or declared bankrupt.
(ii) Must attach sworn affidavit authorizing the signatory of the bid to commit the bidder
(iii) That none of the officers of the Adamawa State Ministry of works and energy Development/Adamawa State Bureau of Public Procurement is/are former or present Director of the company.
(q) All documents for submission must be transmitted with a covering/forwarding letter under the company/firms’ letter Head paper bearing amongst others, the registration number (RC) as issued by the corporate Affairs Commission (CAC), contact address and Telephone Number (preferably GSM No.) and E-mail Address.
Collection of Tender Documents
Interested and qualified companies should collect/ liaise with the Procurement Section of the Adamawa State Ministry of works and Energy Development, Yola and obtained registration document on a deposit of a non-refundable fee of N350,000.00 Only per bid for the CONSTRUCTION OF PEDESTRIAN CROSSING/BRIDE ALONG GALADIMA AMINUN WAY JIMETA YOLA ADAMAWA STATE Payment is to be made to the Ministry of works and Energy Development Bank Account with the following details.
- BANK NAME: ECOBANK, YOLA BRANCH
- ACCOUNT NAME: MINISTRY OF WORKS (PROJECT ACCOUNT)
- ACCOUNT NO: 2603000778
Monday to Friday from 8:00am to 4:30pm
Submission of completed Documents
Prospective bidders are to upload their completed document of both Technical and Financial bids packaged through: saas.biddingadsbpp.com not later than 12:00 noon of the submission dateline.
Failure to upload at the said time will find himself to be blame as the portal will closed at exact deadline and will not open again.
Opening of Bids
The Financial bids will be opened immediately after the dateline for submission (Two weeks from date of advertisement) at 12:00 noon on the 09 June, 2026. at the Ministry of Works and Energy Development conference Hall in the presence of bidders or their representatives while the Technical bids will be kept un-opened. Please be sure to sign the bid submission register in the Hall during the bids opening.
PLEASE NOTE:
Bidders are advised to inspect the project sites, the scopes of works and the blank Bill of Engineering Measurement and Evaluation (BEME) accompanying it, so as to avoid discrepancies in understanding of the project.
Note that the process is not bound to consider the lowest bidder.
Submit their works plan and methodology.
Submit bids and all relevant document with the tittle of project be clearly written at the back as CONSTRUCTION OF PEDESTRIAN CROSSING/BRIDE ALONG GALADIMA AMINUN WAY JIMETA YOLA ADAMAWA STATE in Jimeta Metropolitan Addressed to the,
Permanent Secretary,
Ministry of Works & Energy Development, Secretariat Complex, Lamido Aliyu way, Yola-Adamawa State.
(a) Bids must be in English language and signed by an official authorized by the Bidder.
(b) Bids submitted after the dead-line for the submission would not be received as the portal will be close and you cannot be open again.
(c) Nothing in this advertisement shall be considered a commitment on the part of ADS/MOW, nor shall it entitle responding firms to seek any indemnity from ADS/MOW. ADS/MOW is not bound to pre-qualify any bidder and reserve the right to annul the Procurement process at any time without incurring any liabilities in line with the provisions of the Adamawa State Public Procurement Law, 2020.
(d) This advertisement is an invitation to CSO’s (observers) to participate. This advertisement can be accessed on website at: www.binddingo.com/adsbpp
For enquiries, please contact the Head of Procurement on Mobile No.08036146360.